California Housing Accountability Act: When a City Can Deny Housing, the Preliminary Application and the Permit Deadlines
Government Code §65589.5 is California's Housing Accountability Act. It limits when a city or county may disapprove a housing development project, or cut its density, once the project complies with the objective standards that were in effect when its application was deemed complete. Four other pieces of the Government Code work with it: the preliminary application (§65941.1), the five-hearing limit (§65905.5), the Housing Crisis Act of 2019 (§66300) and the Permit Streamlining Act's clocks (§65943, §65950, §65956). This page quotes each one and keeps to what the text says.
Quick answer
- Denial or lower density. If a housing development project complies with the applicable, objective general plan, zoning, and subdivision standards and criteria in effect when its application was deemed complete, a local agency that proposes to disapprove it or to require a lower density must make written findings, supported by a preponderance of the evidence on the record, that the project would have a specific, adverse impact on public health or safety and that there is no feasible method to mitigate or avoid the impact other than disapproval or lower density (Gov. Code §65589.5(j)(1)).
- Preliminary application. A project is subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application with all of the information in §65941.1(a) was submitted, with listed exceptions (§65589.5(o)(1), (2)). The development application is due within 180 calendar days after it (§65941.1(e)(1)).
- Hearings. No more than five hearings after the application is deemed complete, for a project that complies with the applicable, objective general plan and zoning standards (§65905.5(a)).
- Clocks. A written completeness determination within 30 calendar days of receipt (§65943(a)); a decision to approve or disapprove within the period in §65950(a); a failure to act within the time limits of the article that holds §65950 is deemed approval of the permit application (§65956(b)).
What the Housing Accountability Act is, and which sections hold the rules
This section shall be known, and may be cited, as the Housing Accountability Act.— GOV §65589.5(q)
The section applies to charter cities (§65589.5(g)). The Legislature states how it is to be read:
It is the policy of the state that this section be interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.— GOV §65589.5(a)(2)(L)
| Government Code | What it holds | On this page |
|---|---|---|
| §65589.5 | The Housing Accountability Act: findings required to disapprove or reduce the density of a complying project (j), findings for affordable projects and emergency shelters (d), definitions (h), the effect of a preliminary application (o), court enforcement (k) to (n) | #denial, #preliminary, #city |
| §65941.1 | The preliminary application: what it contains, the fee estimate, the 180-calendar-day and 90-day deadlines | #preliminary |
| §65905.5 | The limit of five hearings | #hearings |
| §66300 | Housing Crisis Act of 2019: limits on less intensive zoning, moratoria, subjective design standards and caps in affected cities and counties | #crisis-act |
| §65943 | Permit Streamlining Act: the completeness determination | #process |
| §65950 | Permit Streamlining Act: the periods to approve or disapprove | #process |
| §65956 | Permit Streamlining Act: deemed approval | #process |
What counts as a housing development project
Under §65589.5(h)(2), a housing development project is a use consisting of any of the following:
- Residential units only (§65589.5(h)(2)(A)).
- A mixed-use development in which at least two-thirds of the new or converted square footage is designated for residential use and no portion is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging (§65589.5(h)(2)(B)(i)). If such a project does include one of those, the portion that does not include it is considered a housing development project (§65589.5(h)(2)(B)(i)(II)(ib)); what “other transient lodging” leaves out is in (ic).
- A mixed-use development in which at least 50 percent of the new or converted square footage is designated for residential use, with at least 500 net new residential units and no portion designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging, except that a portion may be designated for use as a residential hotel (§65589.5(h)(2)(B)(ii)).
- A mixed-use development in which at least 50 percent of the net new or converted square footage is designated for residential use, with at least 500 net new residential units, the demolition or conversion of at least 100,000 square feet of nonresidential use, the demolition of at least 50 percent of the existing nonresidential uses on the site, and the same bar on hotels and other transient lodging, with the same exception for a residential hotel (§65589.5(h)(2)(B)(iii)).
- Transitional housing or supportive housing (§65589.5(h)(2)(C)).
- Farmworker housing, as defined in Health and Safety Code §50199.7(h) (§65589.5(h)(2)(D)).
The preliminary application, the hearing limit, the Housing Crisis Act and two of the Permit Streamlining Act sections use a wider definition, the one in §65905.5(b)(3) (§65941.1(a); §66300(a)(6); §65943(g); §65950(c)). It starts from the definition above and adds projects that involve no discretionary approvals, projects that involve both discretionary and nondiscretionary approvals, and a proposal to construct a single dwelling unit
(§65905.5(b)(3)(B), (C)). That last addition shall not affect the interpretation of the scope of paragraph (2) of subdivision (h) of Section 65589.5
(§65905.5(b)(3)(C)).
The same section holds the builder's remedy: rules for a “builder's remedy project”, a term whose criteria include that the jurisdiction did not have a housing element in substantial compliance (§65589.5(h)(11), (f)(6)). Those provisions, with §65589.5.1 and §65589.5.2, are set out on the builder's remedy page and are not repeated here.
When a city can disapprove or reduce the density of a complying project
The core rule is subdivision (j)(1):
When a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the application was deemed complete, but the local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:— GOV §65589.5(j)(1)
Finding 1: a specific, adverse impact on public health or safety unless the project is disapproved or reduced in density.
“The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density.”
Gov. Code §65589.5(j)(1)(A)
Finding 2: no feasible way to mitigate or avoid that impact other than disapproval or lower density.
“There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.”
Gov. Code §65589.5(j)(1)(B)
Both findings are required. The terms in the rule are defined in the section:
- Specific, adverse impact.
a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete
(§65589.5(j)(1)(A)). The Legislature states its intent that the conditions that would have such an impactarise infrequently
(§65589.5(a)(3)). - Objective.
involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official
(§65589.5(h)(9)). - Lower density. It
includes any conditions that have the same effect or impact on the ability of the project to provide housing
(§65589.5(h)(8)). - Feasible.
capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors
(§65589.5(h)(1)). - Deemed complete. The applicant
has submitted a preliminary application pursuant to Section 65941.1 or, if the applicant has not submitted a preliminary application, has submitted a complete application pursuant to Section 65943
, and the local agency bears the burden of proof in establishing that the application is not complete (§65589.5(h)(5)).
Deemed consistent: the test and the city's deadline to object
Whether a project complies with a standard is decided on this test:
For purposes of this section, a housing development project or emergency shelter shall be deemed consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if there is substantial evidence that would allow a reasonable person to conclude that the housing development project or emergency shelter is consistent, compliant, or in conformity.— GOV §65589.5(f)(4)
A local agency that considers a project inconsistent with a provision must say so in writing, identifying the provision or provisions and explaining the reason or reasons, within a fixed time (§65589.5(j)(2)(A)):
(i) Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units. (ii) Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.— GOV §65589.5(j)(2)(A)(i), (ii)
If the local agency fails to provide the required documentation pursuant to subparagraph (A), the housing development project shall be deemed consistent, compliant, and in conformity with the applicable plan, program, policy, ordinance, standard, requirement, or other similar provision.— GOV §65589.5(j)(2)(B)
Here the clock runs from the date the application is “determined to be complete”, which the section defines as the applicant having submitted a complete application pursuant to §65943 (§65589.5(h)(10)). That is a different term from “deemed complete” in (h)(5). Three more rules narrow what can count as an inconsistency:
- The receipt of a density bonus, incentive, concession, waiver, or reduction of development standards under §65915 is not a valid basis on which to find a project inconsistent (§65589.5(j)(3)).
- A project that is consistent with the objective general plan standards and criteria is not inconsistent with the zoning, and does not require a rezoning, where the zoning for the site is inconsistent with the general plan (§65589.5(j)(4)).
- A change to the zoning ordinance or general plan land use designation after the date the application was deemed complete is not a valid basis to disapprove or condition approval of the project (§65589.5(f)(5)).
What counts as disapproving a project
§65589.5(h)(6) says that to “disapprove the housing development project” includes any instance in which a local agency does any of the following. The list reaches well past a vote to deny:
- (A) Votes or takes final administrative action on the application and the application is disapproved, including any required land use approvals or entitlements necessary for the issuance of a building permit.
- (B) Fails to comply with the time periods specified in §65950(a). An extension of time under Article 5 (commencing with §65950) is deemed an extension of time under this paragraph.
- (C), (D) Fails to meet the time limits specified in §65913.3, or the time limit specified in Health and Safety Code §17970.3. Neither section is in the text read for this page.
- (E) Fails to cease a course of conduct undertaken for an improper purpose, such as to harass or to cause unnecessary delay or needless increases in the cost of the project, that effectively disapproves the project without final administrative action, if all of the conditions in clauses (i) to (vi) are met. Those clauses set a sequence: the applicant gives written notice detailing the conduct; the local agency posts the notice within five working days; it makes no determination until at least 60 days after the notice; and within 90 days of receiving the notice it issues either a written statement that it will immediately cease the conduct or written findings that meet (iv)(I) and (II). An action in furtherance of complying with the California Environmental Quality Act is not a disapproval under this subparagraph (§65589.5(h)(6)(E)(vi)).
- (F) Fails to comply with §65905.5, the hearing limit.
- (G) In the completeness review under §65943: includes in an incompleteness determination an item that is not required on the local agency's submittal requirement checklist (i); in a subsequent review, requests new information that was not identified in the initial determination and upholds that determination in the final written determination on an appeal under §65943(c) (ii); or determines an application incomplete where a reasonable person would conclude that the applicant has submitted all of the items required on the checklist, and upholds that determination on an appeal under §65943(c) (iii). If the agency determines that an application is incomplete after two resubmittals, the agency bears the burden of establishing that the determination is not an effective disapproval (iv).
- (H) Violates §65589.5(f)(6)(D) or (E), which concern builder's remedy projects.
- (I) Makes a written determination that a preliminary application has expired, or that the applicant has otherwise lost its vested rights under the preliminary application, for any reason other than those described in subdivisions (d) and (e) of §65941.1.
- (J), (K) Two subparagraphs about determinations under the California Environmental Quality Act, each tied to the conditions in §65589.5.1 or §65589.5.2 and each inoperative on January 1, 2031 (§65589.5(h)(6)(J)(ii), (K)(ii)). They are covered on the builder's remedy page.
To “condition approval” includes imposing on the housing development project, or attempting to subject it to, development standards, conditions, or policies
(§65589.5(h)(12)).
A second rule for affordable projects and emergency shelters
Subdivision (d) is a separate rule for a housing development project for very low, low-, or moderate-income households, or an emergency shelter. The local agency may not disapprove such a project, or condition approval in a manner that renders it infeasible, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of six things (§65589.5(d)):
- The jurisdiction has adopted a housing element that has been revised in accordance with §65588 and is in substantial compliance, and it has met or exceeded its share of the regional housing need allocation for the planning period for the income category proposed for the project. This finding cannot be used for a project with a mix of income categories if the jurisdiction has not met or exceeded its share for one or more of those categories, and the disapproval or conditional approval may not be based on any reason prohibited by §65008. For an emergency shelter, the jurisdiction must have met or exceeded the need for emergency shelter identified under §65583(a)(7) (§65589.5(d)(1)).
- The project as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid it without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. Inconsistency with the zoning ordinance or general plan land use designation is not such an impact, and neither is eligibility to claim a welfare exemption under Revenue and Taxation Code §214(g) (§65589.5(d)(2)).
- The denial or the conditions are required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible (§65589.5(d)(3)).
- The project is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project (§65589.5(d)(4)).
- On the date the application was deemed complete, the jurisdiction had adopted a revised housing element in substantial compliance, and the project was inconsistent with both the zoning ordinance and the general plan land use designation as specified in any element of the general plan, subject to the limits in subparagraphs (A) and (B) (§65589.5(d)(5)).
- On that date the jurisdiction did not have an adopted revised housing element in substantial compliance and the project is not a builder's remedy project (§65589.5(d)(6)).
“Housing for very low, low-, or moderate-income households” means housing for lower income households, mixed-income households, or moderate-income households (§65589.5(h)(3)(A)). Housing for lower income households is a project in which 100 percent of the units, excluding managers' units, are dedicated to lower income households (§65589.5(h)(3)(B)). Housing for mixed-income households is a project in which at least 7 percent of the total units are dedicated to extremely low income households, or at least 10 percent to very low income households, or at least 13 percent to lower income households, or a project of 10 or fewer total units on a site smaller than one acre proposed at a minimum density of 10 units per acre (§65589.5(h)(3)(C)(i)). Housing for moderate-income households is a project in which 100 percent of the units are sold or rented to moderate-income households (§65589.5(h)(3)(D)). The affordability terms and their length are in (h)(3)(B), (C)(ii) and (D). Paragraph (6) of subdivision (d) turns on whether the project is a builder's remedy project, defined in (h)(11); see the builder's remedy page.
Enforcement in court
- Who may sue. The applicant, a person who would be eligible to apply for residency in the project or emergency shelter, or a housing organization (§65589.5(k)(1)(A)(i)). A housing organization may file only to challenge the disapproval of a housing development (§65589.5(k)(2)).
- The order. If the court finds one of the violations listed in (k)(1)(A)(i), it issues an order or judgment compelling compliance within a time period not to exceed 60 days, and it may direct the local agency to approve the project if it finds the agency acted in bad faith (§65589.5(k)(1)(A)(ii)). The court awards reasonable attorney's fees and costs of suit to the plaintiff or petitioner, except in the two instances in (k)(1)(A)(ii)(I) and (II).
- Fines. If the local agency fails to comply with the order within the time the court prescribes, the court imposes fines (§65589.5(k)(1)(B)):
The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943.
If the court finds both that the local agency acted in bad faith when it violated the section and that it failed to carry out the order or judgment within the time the court prescribed, it multiplies the fine by a factor of five (§65589.5(l)). Bad faithincludes, but is not limited to, an action or inaction that is frivolous, pretextual, intended to cause unnecessary delay, or entirely without merit
(§65589.5(l)). - Burden of proof. In a court action challenging the denial of a housing development for very low, low-, or moderate-income households, or conditions that have a substantial adverse effect on its viability or affordability, the burden is on the local legislative body to show that its decision is consistent with the findings in subdivision (d), supported by a preponderance of the evidence in the record, and with the requirements of subdivision (o) (§65589.5(i)).
- Deadline to file. The action is brought under Code of Civil Procedure §1094.5 (§65589.5(m)(1)), and:
A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h).— GOV §65589.5(m)(1)
The cross-reference is printed as it stands in the text read for this page. In that text, paragraph (5) of subdivision (h) has no subparagraph (B); the provision on time periods among the definitions is (h)(6)(B). This page does not resolve the reference.
The preliminary application (often searched as the SB 330 preliminary application)
Government Code §65941.1 sets out the preliminary application: a defined set of information that, once provided with the permit processing fee, fixes the date of the rules that apply to the project under §65589.5(o). The section does not name a bill; “SB 330 preliminary application” is the name it is commonly searched under. It opens:
An applicant for a housing development project, as defined in paragraph (3) of subdivision (b) of Section 65905.5, shall be deemed to have submitted a preliminary application upon providing all of the following information about the proposed project to the city, county, or city and county from which approval for the project is being sought and upon payment of the permit processing fee:— GOV §65941.1(a)
What it must contain
The seventeen items, in the statute's order:
1. Where the site is.
“The specific location, including parcel numbers, a legal description, and site address, if applicable.”
Gov. Code §65941.1(a)(1)
2. Existing uses and major physical alterations.
“The existing uses on the project site and identification of major physical alterations to the property on which the project is to be located.”
Gov. Code §65941.1(a)(2)
3. A site plan, elevations, and the massing, height and approximate square footage of each building to be occupied.
“A site plan showing the location on the property, elevations showing design, color, and material, and the massing, height, and approximate square footage, of each building that is to be occupied.”
Gov. Code §65941.1(a)(3)
4. Proposed land uses, by units and square feet, in the zoning ordinance's categories.
“The proposed land uses by number of units and square feet of residential and nonresidential development using the categories in the applicable zoning ordinance.”
Gov. Code §65941.1(a)(4)
5. Parking.
“The proposed number of parking spaces.”
Gov. Code §65941.1(a)(5)
6. Pollutant sources.
“Any proposed point sources of air or water pollutants.”
Gov. Code §65941.1(a)(6)
7. Species of special concern.
“Any species of special concern known to occur on the property.”
Gov. Code §65941.1(a)(7)
8. Whether any portion of the property is within one of six listed areas: a very high fire hazard severity zone (A); wetlands (B); a listed or designated hazardous waste site (C); a special flood hazard area subject to inundation by the 1 percent annual chance flood (D); a delineated earthquake fault zone, unless the development complies with the applicable seismic protection building code standards (E); a stream or other resource that may be subject to a streambed alteration agreement (F). Each subparagraph names the agency, map or law that defines the area.
“Whether a portion of the property is located within any of the following:”
Gov. Code §65941.1(a)(8)(A) to (F)
9. Historic or cultural resources.
“Any historic or cultural resources known to exist on the property.”
Gov. Code §65941.1(a)(9)
10. Below market rate units.
“The number of proposed below market rate units and their affordability levels.”
Gov. Code §65941.1(a)(10)
11. Density bonus units and requests.
“The number of bonus units and any incentives, concessions, waivers, or parking reductions requested pursuant to Section 65915.”
Gov. Code §65941.1(a)(11)
12. Subdivision approvals requested.
“Whether any approvals under the Subdivision Map Act, including, but not limited to, a parcel map, a tentative map, or a condominium map, are being requested.”
Gov. Code §65941.1(a)(12)
13. Contact information and, where the applicant is not the owner, the owner's consent.
“The applicant’s contact information and, if the applicant does not own the property, consent from the property owner to submit the application.”
Gov. Code §65941.1(a)(13)
14. In the coastal zone only: whether any portion of the property contains wetlands (A), environmentally sensitive habitat areas (B), a tsunami run-up zone (C), or use of the site for public access to or along the coast (D).
“For a housing development project proposed to be located within the coastal zone, whether any portion of the property contains any of the following:”
Gov. Code §65941.1(a)(14)(A) to (D)
15. Existing homes to be demolished.
“The number of existing residential units on the project site that will be demolished and whether each existing unit is occupied or unoccupied.”
Gov. Code §65941.1(a)(15)
16. A site map of streams and similar resources, and an aerial site photograph.
“A site map showing a stream or other resource that may be subject to a streambed alteration agreement pursuant to Chapter 6 (commencing with Section 1600) of Division 2 of the Fish and Game Code and an aerial site photograph showing existing site conditions of environmental site features that would be subject to regulations by a public agency, including creeks and wetlands.”
Gov. Code §65941.1(a)(16)
17. Recorded public easements.
“The location of any recorded public easement, such as easements for storm drains, water lines, and other public rights of way.”
Gov. Code §65941.1(a)(17)
And the fee: the preliminary application is deemed submitted on providing all of the information above and on payment of the permit processing fee.
“and upon payment of the permit processing fee”
Gov. Code §65941.1(a)
Each local agency compiles a checklist and application form for the preliminary application (§65941.1(c)(1)); where a local agency has not developed its own form, the Department of Housing and Community Development adopts a standardized form applicants may use (§65941.1(c)(2)). The list is closed:
A checklist or form shall not require or request any information beyond that expressly identified in subdivision (a).— GOV §65941.1(c)(3)
The section does not require an affirmative determination by the city or county regarding the completeness of a preliminary application or a development application for purposes of compliance with the section (§65941.1(e)(3)).
What it vests
The vesting language is not in §65941.1. It is in the Housing Accountability Act:
Subject to paragraphs (2), (6), and (7), and subdivision (d) of Section 65941.1, a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.— GOV §65589.5(o)(1)
For purposes of this subdivision, “ordinances, policies, and standards” includes general plan, community plan, specific plan, zoning, design review standards and criteria, subdivision standards and criteria, and any other rules, regulations, requirements, and policies of a local agency, as defined in Section 66000, including those relating to development impact fees, capacity or connection fees or charges, permit or processing fees, and other exactions.— GOV §65589.5(o)(4)
Submitting a preliminary application also makes the application “deemed complete” for the Housing Accountability Act (§65589.5(h)(5)), which is the date subdivision (j)(1) uses for the objective standards a project must meet. Rules adopted after the preliminary application may still apply in five circumstances (§65589.5(o)(2)):
- (A) A fee, charge, or other monetary exaction may rise by an automatic annual adjustment based on an independently published cost index that is referenced in the ordinance or resolution establishing it.
- (B) A preponderance of the evidence in the record establishes that a later ordinance, policy, or standard is necessary to mitigate or avoid a specific, adverse impact upon the public health or safety, as defined in (j)(1)(A), and there is no feasible alternative method to satisfactorily mitigate or avoid the impact.
- (C) A later ordinance, policy, standard, or other measure is necessary to avoid or substantially lessen an impact of the project under the California Environmental Quality Act.
- (D) Construction has not begun in time:
The housing development project has not commenced construction within two and one-half years, or three and one-half years for an affordable housing project, following the date that the project received final approval.
“Affordable housing project” and “final approval” are defined in (o)(2)(D)(i) and (ii). - (E) The project is revised after the preliminary application so that
the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision
.
Four further limits on the vesting rule are in the text:
- The subdivision does not prevent a local agency from subjecting the additional units or square footage of construction that result from project revisions after the preliminary application to the ordinances, policies, and standards adopted and in effect when the preliminary application was submitted (§65589.5(o)(3)).
- It does not restrict the authority to require mitigation measures to lessen the impacts of a project under the California Environmental Quality Act (§65589.5(o)(6)).
- For completed residential units for which the project approval process is complete and a certificate of occupancy has been issued, it does not limit later ordinances that regulate the use and occupancy of those units, such as ordinances on rental housing inspection, rent stabilization, restrictions on short-term renting, and business licensing for owners of rental housing (§65589.5(o)(7)).
- The listing of a tribal cultural resource on a national, state, tribal, or local historic register on or after the date the preliminary application is submitted is not deemed a change to the ordinances, policies, and standards in effect at that time, and the preliminary application does not preclude such a listing (§65941.1(f)).
Requiring a project to comply with an ordinance, policy, or standard that was not adopted and in effect when the preliminary application was submitted, in violation of subdivision (o), is one of the violations a court may remedy (§65589.5(k)(1)(A)(i)(III)).
The deadlines that follow, and what ends it
Within 180 calendar days after submitting a preliminary application with all of the information required by subdivision (a) to a city, county, or city and county, the development proponent shall submit an application for a development project that includes all of the information required to process the development application consistent with Sections 65940, 65941, and 65941.5.— GOV §65941.1(e)(1)
If the public agency determines that the application for the development project is not complete pursuant to Section 65943, the development proponent shall submit the specific information needed to complete the application within 90 days of receiving the agency’s written identification of the necessary information. If the development proponent does not submit this information within the 90-day period, then the preliminary application shall expire and have no further force or effect.— GOV §65941.1(e)(2)
After submittal of all of the information required by subdivision (a), if the development proponent revises the project such that the number of residential units or square footage of construction changes by 20 percent or more, exclusive of any increase resulting from the receipt of a density bonus, incentive, concession, waiver, or similar provision, the housing development project shall not be deemed to have submitted a preliminary application that satisfies this section until the development proponent resubmits the information required by subdivision (a) so that it reflects the revisions.— GOV §65941.1(d)
Read together:
- 180 calendar days to submit the development application (§65941.1(e)(1)). The paragraph states the deadline as a duty. It does not itself say what follows if the deadline is missed.
- 90 days to supply what the agency identifies as missing. This is the one place where the section says the preliminary application expires (§65941.1(e)(2)).
- A revision of 20 percent or more in the number of residential units or square footage of construction, not counting density bonus increases, means the project is not deemed to have submitted a preliminary application until the information is resubmitted (§65941.1(d)). “Square footage of construction” means the building area, as defined by the California Building Standards Code (§65941.1(d)).
- A local agency's written determination that a preliminary application has expired, or that the vested rights are lost, for any reason other than those in §65941.1(d) and (e) counts as disapproving the project (§65589.5(h)(6)(I)).
The fee and exaction estimate
A development proponent may include in the preliminary application a request for a preliminary fee and exaction estimate, which the city or county provides within 30 business days of the submission of the preliminary application
(§65941.1(b)(1)). The estimate is a good faith estimate of the total amount of fees and exactions expected to be imposed in connection with the project
(§65941.1(b)(3)(C)), and it shall be for informational purposes only and shall not be legally binding
(§65941.1(b)(5)). For fees imposed by another agency, including a school district or a special district, the proponent requests the fee schedule from that agency, which provides it without delay (§65941.1(b)(2)).
The five-hearing limit
Notwithstanding any other law, if a proposed housing development project complies with the applicable, objective general plan and zoning standards in effect at the time an application is deemed complete, after the application is deemed complete, a city, county, or city and county shall not conduct more than five hearings pursuant to Section 65905, or any other law, ordinance, or regulation requiring a public hearing in connection with the approval of that housing development project. If the city, county, or city and county continues a hearing subject to this section to another date, the continued hearing shall count as one of the five hearings allowed under this section. The city, county, or city and county shall consider and either approve or disapprove the application at any of the five hearings allowed under this section consistent with the applicable timelines under the Permit Streamlining Act (Chapter 4.5 (commencing with Section 65920)).— GOV §65905.5(a)
Three definitions decide how the limit counts (§65905.5(b)):
- Hearing.
“Hearing” includes any public hearing, workshop, or similar meeting, including any appeal, conducted by the city or county with respect to the housing development project, including any meeting relating to Section 65915, whether by the legislative body of the city or county, the planning agency established pursuant to Section 65100, or any other agency, department, board, commission, or any other designated hearing officer or body of the city or county, or any committee or subcommittee thereof.
(§65905.5(b)(2)) - Not a hearing.
“Hearing” does not include a hearing to review a legislative approval, including any appeal, required for a proposed housing development project, including, but not limited to, a general plan amendment, a specific plan adoption or amendment, or a zoning amendment, or any hearing arising from a timely appeal of the approval or disapproval of a legislative approval.
(§65905.5(b)(2)) - Deemed complete. For this section the phrase has its own meaning:
the application has met all of the requirements specified in the relevant list compiled pursuant to Section 65940 that was available at the time when the application was submitted
(§65905.5(b)(1)). That is not the definition the Housing Accountability Act uses in §65589.5(h)(5).
The same reasonable-person test decides whether the project complies: it is deemed consistent if there is substantial evidence that would allow a reasonable person to conclude that it is, and a density bonus under §65915 is not a valid basis to find it inconsistent (§65905.5(c)(1)). Nothing in the section supersedes, limits, or otherwise modifies the requirements of the California Environmental Quality Act (§65905.5(d)). Failing to comply with §65905.5 counts as disapproving the project under the Housing Accountability Act (§65589.5(h)(6)(F)). The amendments made in §65905.5(b)(3)(B) do not affect a project for which an application was submitted to the city or county before January 1, 2022 (§65905.5(e)).
The Housing Crisis Act: downzoning, moratoria and no net loss of capacity
Government Code §66300 sits in the article headed Housing Crisis Act of 2019. It restricts what an “affected city” or “affected county” may enact on land where housing is an allowable use (§66300(b)(1)). An affected city is a city, including a charter city, that the Department of Housing and Community Development determines is in an urbanized area or urban cluster as designated by the United States Census Bureau, other than a city with a population of 5,000 or less that is not located within an urbanized area (§66300(a)(1)). An affected county is defined as a census-designated place, based on the 2013-2017 American Community Survey 5-year Estimates, that is wholly located within the boundaries of an urbanized area (§66300(a)(2)). Both terms include the electorate acting by initiative or referendum (§66300(a)(3)).
An affected city or county may not enact a development policy, standard, or condition that would have any of these effects:
- Less intensive use (§66300(b)(1)(A)). Changing the general plan land use designation, specific plan land use designation, or zoning of a parcel to a less intensive use, or reducing the intensity of land use within an existing designation or zoning district,
below what was allowed under the land use designation or zoning ordinances of the affected county or affected city, as applicable, as in effect on January 1, 2018
. Reducing the intensity of land useincludes, but is not limited to, reductions to height, density, or floor area ratio, new or increased open space or lot size requirements, new or increased setback requirements, minimum frontage requirements, or maximum lot coverage limitations, or any other action that would individually or cumulatively reduce the site’s residential development capacity
. - Moratoria (§66300(b)(1)(B)).
Imposing a moratorium or similar restriction or limitation on housing development, including mixed-use development, within all or a portion of the jurisdiction of the affected county or city, other than to specifically protect against an imminent threat to the health and safety of persons residing in, or within the immediate vicinity of, the area subject to the moratorium or for projects specifically identified as existing restricted affordable housing.
A zoning ordinance imposing a moratorium or similar restriction may not be enforced until it has been submitted to, and approved by, the Department of Housing and Community Development; if the department denies approval, the ordinance is deemed void (§66300(b)(1)(B)(ii)). - Subjective design standards (§66300(b)(1)(C)).
Imposing or enforcing design standards established on or after January 1, 2020, that are not objective design standards.
- Caps (§66300(b)(1)(D)). Establishing or implementing a provision that limits the number of land use approvals or permits necessary for the approval and construction of housing, acts as a cap on the number of housing units that can be approved or constructed annually or for some other period, or limits the population. Subparagraph (E) keeps one exception: a limit approved by voters before January 1, 2005, in an affected city or county located in a predominantly agricultural county, meaning a county with more than 550,000 acres of agricultural land in which at least one-half of the county area is agricultural land (§66300(b)(1)(E)).
A development policy, standard, or condition enacted on or after the section's effective date that does not comply with it is deemed void (§66300(b)(2)).
No net loss of residential capacity
This section does not prohibit an affected county or an affected city, including the local electorate acting through the initiative process, from changing a land use designation or zoning ordinance to a less intensive use, or reducing the intensity of land use, if the city or county concurrently changes the development standards, policies, and conditions applicable to other parcels within the jurisdiction to ensure that there is no net loss in residential capacity.— GOV §66300(h)(1)
“Concurrently” means the action is approved at the same meeting of the legislative body (§66300(h)(2)(A)). If the action that would result in a net loss of residential capacity is requested by an applicant for a housing development project, it means within 180 days (§66300(h)(2)(B)). For an initiative measure, the added capacity must take effect at the same time as the reduction (§66300(h)(2)(C)). Paragraph (3) holds a rule for the City of San Jose alone, and paragraph (4) exempts a change to a less intensive use on a site that was a mobilehome park as of the section's effective date (§66300(h)(3), (4)).
What §66300 leaves open
- Prohibiting the commercial use of land designated for residential use, including short-term occupancy of a residence, consistent with other law (§66300(c)).
- Adopting or amending a policy, standard, or condition in a manner that allows greater density, facilitates the development of housing, reduces the costs to a housing development project, or imposes mitigation measures necessary to comply with the California Environmental Quality Act (§66300(e)(3)).
- Enacting a policy, standard, or condition intended to preserve or facilitate the production of housing for lower income households, or housing types that traditionally serve them, including mobilehome parks, single-room occupancy units, or units subject to rent or price control (§66300(i)).
- A height limit, urban growth boundary, or urban limit established by the electorate, provided it complies with (b)(1)(A) (§66300(f)).
- The requirements of the California Environmental Quality Act and the California Coastal Act of 1976 (§66300(g)).
- The section does not apply to a housing development project located within a very high fire hazard severity zone (§66300(e)(4)).
Replacement housing and the end date
§66300 as read for this page holds no rule on demolishing or replacing existing homes. The law file's notes record that §66300.5 and §66300.6 exist in Article 2 of the Housing Crisis Act and that §66301 was repealed by AB 130 (Stats. 2025, Ch. 22); none of the three was read for this page, so this page says nothing about replacement units.
§66300 as read contains no sentence that repeals it or makes it inoperative. The only end date in its text concerns the list of affected cities and counties: The department’s determination shall remain valid until January 1, 2030.
(§66300(d))
What the city or county may still require, and what it may not
It may
- Require the project to comply with
objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdiction’s share of the regional housing need pursuant to Section 65584
. Those standardsshall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development
(§65589.5(f)(1)). - Impose fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the project (§65589.5(f)(3)).
- Comply with, and make the findings required by, the California Environmental Quality Act, and comply with the congestion management program and the California Coastal Act of 1976; nothing in the Act relieves the agency of those (§65589.5(e)). It may require mitigation measures under the California Environmental Quality Act (§65589.5(o)(6)).
- Where the zoning for the site is inconsistent with the general plan and the agency has complied with (j)(2), require the project to comply with the objective standards and criteria of the zoning that is consistent with the general plan, applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the project (§65589.5(j)(4)).
- Apply a later ordinance, policy, or standard in the five circumstances in §65589.5(o)(2).
- Charge a fee for the completeness review, not to exceed the amount reasonably necessary to provide the service (§65943(e)).
- Treat an applicant's failure to submit complete or adequate information under §§65943 to 65944 as something that may constitute grounds for disapproving a development project (§65956(c)).
It may not
- Disapprove a complying housing development project, or require a lower density, without the two written findings in §65589.5(j)(1).
- Rely on a change to the zoning ordinance or general plan land use designation made after the application was deemed complete (§65589.5(f)(5)).
- Treat the receipt of a density bonus, incentive, concession, waiver, or reduction of development standards under §65915 as an inconsistency (§65589.5(j)(3)). Nothing in the Act limits a project's eligibility for those (§65589.5(f)(1)).
- Subject a project to ordinances, policies, and standards adopted after a preliminary application with all of the §65941.1(a) information was submitted, outside the circumstances in (o)(2) (§65589.5(o)(1)).
- Ask in a preliminary application checklist or form for information beyond that expressly identified in §65941.1(a) (§65941.1(c)(3)).
- In a later completeness review, request new information that was not stated in the initial list of items that were not complete (§65943(a)).
- Conduct more than five hearings on a project that complies with the applicable, objective general plan and zoning standards, after its application is deemed complete (§65905.5(a)).
- In an affected city or county, enact the measures listed in §66300(b)(1).
Density bonus law itself (§65915) is on the California density bonus law page.
The Permit Streamlining Act clocks: completeness, decision and deemed approval
Three sections set the clocks for a development application. The first is the completeness determination:
Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete and shall immediately transmit the determination to the applicant for the development project. If the application is determined to be incomplete, the lead agency shall provide the applicant with an exhaustive list of items that were not complete. That list shall be limited to those items actually required on the lead agency’s submittal requirement checklist. In any subsequent review of the application determined to be incomplete, the local agency shall not request the applicant to provide any new information that was not stated in the initial list of items that were not complete. If the written determination is not made within 30 days after receipt of the application, and the application includes a statement that it is an application for a development permit, the application shall be deemed complete for purposes of this chapter. Upon receipt of any resubmittal of the application, a new 30-day period shall begin, during which the public agency shall determine the completeness of the application.— GOV §65943(a)
After a resubmittal the agency has another 30 calendar days and may decide only whether the application now includes the information on its list; if it makes no written determination in that period, the application together with the submitted materials is deemed complete (§65943(b)). If the agency again finds the application incomplete, it must provide a process to appeal in writing to its governing body or, if there is none, to its director; a city or county provides the appeal to the governing body or, at its option, the planning commission, or both (§65943(c)). On that appeal:
There shall be a final written determination by the agency on the appeal not later than 60 calendar days after receipt of the applicant’s written appeal. The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 60-day period. Notwithstanding a decision pursuant to subdivision (b) that the application and submitted materials are not complete, if the final written determination on the appeal is not made within that 60-day period, the application with the submitted materials shall be deemed complete for the purposes of this chapter.— GOV §65943(c)
The applicant and the agency may agree to extend any time limit in §65943 (§65943(d)). Each city and county must make its §65940 list of required information for a housing development project available in writing and on its internet website (§65943(f)).
The second section sets the time to decide. It begins:
A public agency that is the lead agency for a development project shall approve or disapprove the project within whichever of the following periods is applicable:— GOV §65950(a)
Seven periods follow, each tied to the environmental document or the kind of review; they are in the table below. The 60-day period in (a)(3) applies only if at least 49 percent of the units are affordable to very low or low-income households on the terms in (A); the lead agency received, before the application was deemed complete, the applicant's written notice described in (B) that an application for financial assistance from a public agency or federal agency has been or will be made; and there is confirmation that the application for assistance was made before the environmental impact report was certified (§65950(a)(3)(A) to (C)). In (a)(2) and (a)(3), “development project” means a housing development project as defined in §65905.5(b)(3) (§65950(c)). The applicant and the agency may agree in writing to an extension pursuant to §65957 (§65950(b)); §65957 is not in the text read for this page.
The third section states what a missed decision deadline does:
In the event that a lead agency or a responsible agency fails to act to approve or to disapprove a development project within the time limits required by this article, the failure to act shall be deemed approval of the permit application for the development project.— GOV §65956(b)
“This article” is the article that holds §65950 and §65956, headed Approval of Development Permits. Two qualifications are in the same section: nothing in it diminishes the permitting agency's legal responsibility to provide, where applicable, public notice and hearing before acting on a permit application (§65956(d)); and where a required public notice or hearing has not been provided or held at least 60 days prior to the expiration of the time limits established by Sections 65950 and 65952
, the applicant may file an action under Code of Civil Procedure §1085 to compel it (§65956(a)). Under the Housing Accountability Act, a failure to comply with the time periods in §65950(a) also counts as disapproving a housing development project (§65589.5(h)(6)(B)). The two sections state these consequences separately and this page does not reconcile them.
| What must happen | Period | What starts it | Gov. Code |
|---|---|---|---|
| The agency determines in writing whether the application is complete | 30 calendar days | Date the public agency received the application for the development project | §65943(a) |
| The agency determines in writing whether the application as supplemented or amended is complete | 30 calendar days | Date the public agency received the resubmittal, or the materials submitted in response to its list | §65943(a), (b) |
| The agency makes its final written determination on the appeal | 60 calendar days | Date the agency received the applicant’s written appeal | §65943(c) |
| The development proponent submits the application for the development project | 180 calendar days | Date the preliminary application was submitted with all of the information required by §65941.1(a) | §65941.1(e)(1) |
| The development proponent submits the specific information needed to complete the application | 90 days | Date the development proponent received the agency’s written identification of the necessary information | §65941.1(e)(2) |
| The local agency gives the applicant written documentation of each provision it considers the project inconsistent with, and why: 150 or fewer housing units | 30 days | Date the application for the housing development project was determined to be complete | §65589.5(j)(2)(A)(i) |
| The local agency gives the applicant written documentation of each provision it considers the project inconsistent with, and why: More than 150 units | 60 days | Date the application for the housing development project was determined to be complete | §65589.5(j)(2)(A)(ii) |
| The lead agency approves or disapproves the project: (a)(1) Environmental impact report prepared for the development project | 180 days | Date the lead agency certified the environmental impact report | §65950(a)(1) |
| The lead agency approves or disapproves the project: (a)(2) Environmental impact report prepared for a housing development project as defined in §65950(c) | 90 days | Date the lead agency certified the environmental impact report | §65950(a)(2) |
| The lead agency approves or disapproves the project: (a)(3) Environmental impact report, housing development project, at least 49 percent of units affordable to very low or low-income households and every condition in (a)(3)(A) to (C) met | 60 days | Date the lead agency certified the environmental impact report | §65950(a)(3) |
| The lead agency approves or disapproves the project: (a)(4) Negative declaration completed and adopted | 60 days | Date the lead agency adopted the negative declaration | §65950(a)(4) |
| The lead agency approves or disapproves the project: (a)(5) Project exempt from the California Environmental Quality Act | 60 days | Date of the lead agency’s determination that the project is exempt from the California Environmental Quality Act | §65950(a)(5) |
| The lead agency approves or disapproves the project: (a)(6) Project subject to ministerial review by the public agency | 60 days | Date of receipt of a complete application | §65950(a)(6) |
| The lead agency approves or disapproves the project: (a)(7) Project exempt under Public Resources Code §21080.66 | 30 days | The later of the two dates in §65950(a)(7): the conclusion of the process in Public Resources Code §21080.66(b), or the expiration of the applicable time limit in §65589.5(j)(2) | §65950(a)(7) |
| The city or county provides a preliminary fee and exaction estimate, if the preliminary application asked for one | 30 business days | Submission of the preliminary application | §65941.1(b)(1) |
| If a required public notice or hearing has not been provided or held by this point, the applicant may file an action to compel it | 60 days before the time limits expire | Counted back from the expiration of the time limits established by §65950 and §65952 | §65956(a) |
| A petition to enforce the Housing Accountability Act is filed and served | 90 days | The later of the two events named in §65589.5(m)(1) | §65589.5(m)(1) |
The statute's words for each period the calculator counts:
- “Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete and shall immediately transmit the determination to the applicant for the development project.” — Gov. Code §65943(a)
- “Upon receipt of any resubmittal of the application, a new 30-day period shall begin, during which the public agency shall determine the completeness of the application. … Not later than 30 calendar days after receipt of the submitted materials described in subdivision (a), the public agency shall determine in writing whether the application as supplemented or amended by the submitted materials is complete” — Gov. Code §65943(a), (b)
- “There shall be a final written determination by the agency on the appeal not later than 60 calendar days after receipt of the applicant’s written appeal.” — Gov. Code §65943(c)
- “Within 180 calendar days after submitting a preliminary application with all of the information required by subdivision (a) to a city, county, or city and county, the development proponent shall submit an application for a development project that includes all of the information required to process the development application consistent with Sections 65940, 65941, and 65941.5.” — Gov. Code §65941.1(e)(1)
- “the development proponent shall submit the specific information needed to complete the application within 90 days of receiving the agency’s written identification of the necessary information. If the development proponent does not submit this information within the 90-day period, then the preliminary application shall expire and have no further force or effect.” — Gov. Code §65941.1(e)(2)
- “Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units.” — Gov. Code §65589.5(j)(2)(A)(i)
- “Within 60 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains more than 150 units.” — Gov. Code §65589.5(j)(2)(A)(ii)
- “One hundred eighty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for the development project.” — Gov. Code §65950(a)(1)
- “Ninety days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c).” — Gov. Code §65950(a)(2)
- “Sixty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for a development project defined in subdivision (c) and all of the following conditions are met:” — Gov. Code §65950(a)(3)
- “Sixty days from the date of adoption by the lead agency of the negative declaration, if a negative declaration is completed and adopted for the development project.” — Gov. Code §65950(a)(4)
- “Sixty days from the determination by the lead agency that the project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), if the project is exempt from that act.” — Gov. Code §65950(a)(5)
- “Except as provided in subdivision (a) of Section 65912.114 and subdivision (a) of Section 65912.124, sixty days from the date of receipt of a complete application if the project is subject to ministerial review by the public agency.” — Gov. Code §65950(a)(6)
- “If a development project is exempt from the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) pursuant to Section 21080.66 of the Public Resources Code, 30 days from the later of the following dates: (A) The conclusion of the process outlined in subdivision (b) of Section 21080.66 of the Public Resources Code. (B) The expiration of the applicable time limit in paragraph (2) of subdivision (j) of Section 65589.5.” — Gov. Code §65950(a)(7)
Application deadline calculator
The same calculator has a page of its own, with every period in one table and what the statute says follows a missed deadline: Permit Streamlining Act deadline calculator.
Enter the date an application was received, or the date of any later event, to see when each statutory period ends. The periods, their starting events and their subdivisions are the ones in the table above.
These are the statute's periods counted from the dates you enter. Extensions, resubmittals, tolling and the project's facts change real deadlines.
Enter a date for any event that has happened. Each result is that date plus the number of days the statute states. The date you enter is not counted and the last day is, as Government Code §6800 provides: “The time in which any act provided by law is to be done is computed by excluding the first day, and including the last, unless the last day is a holiday, and then it is also excluded.”
Completeness: the first determination
The agency determines in writing whether the application is complete. 30 calendar days, Gov. Code §65943(a).
Enter the date above to see when this period ends.
The statute's words: “Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete and shall immediately transmit the determination to the applicant for the development project.”
If the written determination is not made within 30 days after receipt, and the application includes a statement that it is an application for a development permit, the application is deemed complete for purposes of the chapter (§65943(a)). The applicant and the agency may agree to extend any time limit in the section (§65943(d)).
Completeness: after a resubmittal
The agency determines in writing whether the application as supplemented or amended is complete. 30 calendar days, Gov. Code §65943(a), (b).
Enter the date above to see when this period ends.
The statute's words: “Upon receipt of any resubmittal of the application, a new 30-day period shall begin, during which the public agency shall determine the completeness of the application. … Not later than 30 calendar days after receipt of the submitted materials described in subdivision (a), the public agency shall determine in writing whether the application as supplemented or amended by the submitted materials is complete”
If the written determination is not made within that 30-day period, the application together with the submitted materials is deemed complete for purposes of the chapter (§65943(b)).
Completeness: appeal of a determination that the application is not complete
The agency makes its final written determination on the appeal. 60 calendar days, Gov. Code §65943(c).
Enter the date above to see when this period ends.
The statute's words: “There shall be a final written determination by the agency on the appeal not later than 60 calendar days after receipt of the applicant’s written appeal.”
If the final written determination on the appeal is not made within that 60-day period, the application with the submitted materials is deemed complete for the purposes of the chapter. An appeal permitted to both the planning commission and the governing body does not extend the 60-day period (§65943(c)).
After a preliminary application: the development application
The development proponent submits the application for the development project. 180 calendar days, Gov. Code §65941.1(e)(1).
Enter the date above to see when this period ends.
The statute's words: “Within 180 calendar days after submitting a preliminary application with all of the information required by subdivision (a) to a city, county, or city and county, the development proponent shall submit an application for a development project that includes all of the information required to process the development application consistent with Sections 65940, 65941, and 65941.5.”
After a preliminary application: supplying what the agency says is missing
The development proponent submits the specific information needed to complete the application. 90 days, Gov. Code §65941.1(e)(2).
Enter the date above to see when this period ends.
The statute's words: “the development proponent shall submit the specific information needed to complete the application within 90 days of receiving the agency’s written identification of the necessary information. If the development proponent does not submit this information within the 90-day period, then the preliminary application shall expire and have no further force or effect.”
Housing Accountability Act: the agency’s written documentation of any inconsistency
The local agency gives the applicant written documentation of each provision it considers the project inconsistent with, and why. 30 days, Gov. Code §65589.5(j)(2)(A)(i).
Enter the date above to see when this period ends.
The statute's words: “Within 30 days of the date that the application for the housing development project is determined to be complete, if the housing development project contains 150 or fewer housing units.”
If the local agency fails to provide the documentation, the project is deemed consistent, compliant, and in conformity with the provision (§65589.5(j)(2)(B)). “Determined to be complete” means the applicant has submitted a complete application pursuant to §65943 (§65589.5(h)(10)).
Permit Streamlining Act: the lead agency approves or disapproves the project
The lead agency approves or disapproves the project. 180 days, Gov. Code §65950(a)(1).
Enter the date above to see when this period ends.
The statute's words: “One hundred eighty days from the date of certification by the lead agency of the environmental impact report, if an environmental impact report is prepared pursuant to Section 21100 or 21151 of the Public Resources Code for the development project.”
A failure to act to approve or disapprove within the time limits required by the article is deemed approval of the permit application (§65956(b)). The applicant and the agency may agree in writing to an extension (§65950(b)).
Nothing you enter is stored or sent anywhere; the dates are worked out in your browser and are gone when you leave the page.
How the days are counted. §65943 and §65941.1(e)(1) state their periods in “calendar days”; §65941.1(e)(2), §65589.5(j)(2)(A) and §65950(a) say “days”. The calculator counts every consecutive day in both cases, under the general rule in Government Code §6800: The time in which any act provided by law is to be done is computed by excluding the first day, and including the last, unless the last day is a holiday, and then it is also excluded.
So the date you enter is not counted and the last day is. Section 6700(a)(1) makes every Sunday a holiday, so when a period ends on a Sunday the calculator also shows the following Monday. It does not check the other holidays listed in §6700, some of which apply to a city or county only if it has adopted them (§6700(a)(20)(B)), and it does not move a Saturday: §6706 and §6707 let some acts that fall on a holiday, or filings with a state agency that fall on a Saturday, be done on the next business day, and whether either applies to one of these periods is not decided here. The 30-business-day fee estimate (§65941.1(b)(1)) and the five-working-day posting step (§65589.5(h)(6)(E)(ii)) are not counted, because the text read does not define those terms.
What changed, and what changes next
Bills chaptered in 2026 that touch the sections quoted on this page:
AB 1621 (Stats. 2026, Ch. 780): GOV §65589.5 amended
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “Planning and Zoning Law: postentitlement phase permits: Housing Accountability Act.” What AB 1621 changes, in the Legislative Counsel's words
SB 1072 (Stats. 2026, Ch. 322): GOV §65589.5 amended; GOV §66300 amended
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “Housing omnibus.” What SB 1072 changes, in the Legislative Counsel's words
SB 1433 (Stats. 2026, Ch. 57): GOV §65589.5 amended; GOV §65950 amended
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “Maintenance of the codes.” What SB 1433 changes, in the Legislative Counsel's words
This page does not describe what a bill that is not yet in effect changes. The latest amendment of each section, as the Legislature prints it:
- §65589.5: Amended by Stats. 2025, Ch. 789, Sec. 1.5. (SB 838) Effective January 1, 2026. Inoperative January 1, 2031, pursuant to Sec. 1 of Stats. 2023, Ch. 768.
- §65941.1: Amended by Stats. 2025, Ch. 22, Sec. 18. (AB 130) Effective June 30, 2025.
- §65905.5: Amended by Stats. 2025, Ch. 22, Sec. 12. (AB 130) Effective June 30, 2025.
- §66300: Amended by Stats. 2023, Ch. 754, Sec. 5. (AB 1218) Effective January 1, 2024.
- §65943: Amended (as amended by Stats. 2021, Ch. 161, Sec. 7) by Stats. 2025, Ch. 22, Sec. 19. (AB 130) Effective June 30, 2025.
- §65950: Amended by Stats. 2025, Ch. 650, Sec. 4. (SB 158) Effective October 11, 2025.
- §65956: Amended by Stats. 2025, Ch. 22, Sec. 25. (AB 130) Effective June 30, 2025.
The file holds one current version of each of these sections. Its notes record that AB 130 (Stats. 2025, Ch. 22) left one current version each of §65943 and §65950, which had previously existed in two versions.
Inoperative and repeal dates in the text
The text of §65589.5 as read has no sentence that makes the whole section inoperative; the Legislature's history line above carries a January 1, 2031 date. Inside the section, seven provisions carry their own end date:
- §65589.5(h)(6)(J) and (h)(6)(K), the two definitions of disapproval tied to the California Environmental Quality Act:
This subparagraph shall become inoperative on January 1, 2031.
- §65589.5(h)(7), the definition of “lawful determination”, and (m)(2) and (m)(3), on when those two kinds of disapproval are final:
This paragraph shall become inoperative on January 1, 2031.
- §65589.5(k)(1)(A)(ii)(II), the second exception to an award of attorney's fees:
This subclause shall become inoperative on January 1, 2031.
- §65589.5(p), on attorney's fees in a case challenging a local agency's approval of a housing development project:
This subdivision shall become inoperative on January 1, 2031.
- §65589.5.1 and §65589.5.2, the two companion sections those provisions refer to, each end with:
This section shall remain in effect only until January 1, 2031, and as of that date is repealed.
(§65589.5.1(d); §65589.5.2(c)) - §66300(d), the list of affected cities and counties:
The department’s determination shall remain valid until January 1, 2030.
The paragraph for the City of San Jose becomes inoperative on the date that city's sixth-cycle housing element update is due (§66300(h)(3)(D)).
§65941.1, §65905.5, §65943, §65950 and §65956 as read contain no sentence that makes the section operative, inoperative or repealed on a date.
What this page does not cover
- The local standards themselves. Whether a project complies depends on the city's or county's own objective general plan, zoning, subdivision and design review standards, and on its submittal requirement checklist. None of those is on this page.
- The project's facts. Unit counts, square footage, the environmental document, the dates of each submittal and any agreed extension decide which rule and which period apply.
- The builder's remedy. §65589.5(f)(6), (h)(11), §65589.5.1 and §65589.5.2 are on the builder's remedy page.
- Environmental review. The Act leaves the California Environmental Quality Act in place (§65589.5(e)). Exemptions for housing are on the CEQA exemptions for housing page.
- Other state housing laws that may also apply, each on its own page: density bonus law, SB 423 streamlined approval, AB 2011, SB 79 and SB 9.
- Sections the text refers to but that were not read: §65913.3 and Health and Safety Code §17970.3 (time limits named in §65589.5(h)(6)(C), (D)); §65940, §65941 and §65941.5 (what a development application must include); §65952 and §65957 (other Permit Streamlining Act time limits and extensions); §65912.114 and §65912.124 (excepted from §65950(a)(6)); §66300.5 and §66300.6 (demolition and replacement housing). Public Resources Code §21080.66 is set out on the CEQA exemptions page.
- Holidays other than Sundays, and Saturdays. The calculator applies Government Code §6800 and the Sunday rule in §6700(a)(1) only; see the note under the calculator.
- Court decisions and agency guidance. This page reads the statute only. It does not report how courts or the Department of Housing and Community Development have applied it.
Frequently Asked Questions
What is the Housing Accountability Act in California?
It is Government Code §65589.5, which says of itself: “This section shall be known, and may be cited, as the Housing Accountability Act.” (§65589.5(q)). Its central rule, in subdivision (j)(1), applies when a proposed housing development project complies with the applicable, objective general plan, zoning, and subdivision standards and criteria in effect when its application was deemed complete. A local agency that proposes to disapprove that project, or to require a lower density, must base its decision on written findings, supported by a preponderance of the evidence on the record, that the project would have a specific, adverse impact on public health or safety and that there is no feasible method to mitigate or avoid that impact other than disapproval or lower density. The section applies to charter cities (§65589.5(g)).
Can a California city deny a housing project that meets its zoning?
Only on the two findings in Government Code §65589.5(j)(1), made in writing and supported by a preponderance of the evidence on the record: that the project would have a specific, adverse impact on public health or safety unless it is disapproved or reduced in density, and that there is no feasible method to satisfactorily mitigate or avoid that impact any other way. The statute defines the impact as “a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete” (§65589.5(j)(1)(A)). The rule applies to a project that complies with the applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards (§65589.5(j)(1)). A project is deemed consistent with a standard if there is substantial evidence that would allow a reasonable person to conclude that it is (§65589.5(f)(4)).
What does an SB 330 preliminary application lock in?
The preliminary application is set out in Government Code §65941.1, and its effect is in the Housing Accountability Act, §65589.5(o)(1): “a housing development project shall be subject only to the ordinances, policies, and standards adopted and in effect when a preliminary application including all of the information required by subdivision (a) of Section 65941.1 was submitted.” The phrase covers general plan, community plan, specific plan, zoning, design review and subdivision standards and criteria, and other rules of a local agency, including development impact fees and other exactions (§65589.5(o)(4)). Subdivision (o)(2) lists five circumstances in which later rules may still apply, including automatic annual fee adjustments tied to a published cost index, a failure to start construction within two and one-half years of final approval (three and one-half years for an affordable housing project), and a revision that changes the unit count or square footage by 20 percent or more.
How long is a preliminary application good for in California?
Government Code §65941.1(e)(1) gives the development proponent 180 calendar days after submitting the preliminary application to submit the application for the development project. If the agency then finds that application incomplete under §65943, the proponent has 90 days from receiving the agency's written identification of the necessary information to submit it; if it does not, “the preliminary application shall expire and have no further force or effect” (§65941.1(e)(2)). Separately, if the project is revised so that the number of residential units or the square footage of construction changes by 20 percent or more, not counting density bonus increases, the project is not deemed to have submitted a preliminary application until the information is resubmitted to reflect the revision (§65941.1(d)).
How many public hearings can a California city hold on a housing project?
Five, for a project that complies with the applicable, objective general plan and zoning standards in effect when its application is deemed complete. After that point the city or county “shall not conduct more than five hearings pursuant to Section 65905, or any other law, ordinance, or regulation requiring a public hearing in connection with the approval of that housing development project” (Gov. Code §65905.5(a)). A continued hearing counts as one of the five (§65905.5(a)). “Hearing” includes any public hearing, workshop, or similar meeting, including any appeal; it does not include a hearing to review a legislative approval such as a general plan amendment, a specific plan adoption or amendment, or a zoning amendment (§65905.5(b)(2)).
How long does a California city have to decide whether a development application is complete?
Thirty calendar days. Government Code §65943(a) begins: “Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete”. If the application is incomplete, the agency must give an exhaustive list of the items that were not complete, limited to items actually required on its submittal requirement checklist, and in a later review it may not ask for new information that was not on that first list (§65943(a)). If no written determination is made within 30 days after receipt, and the application includes a statement that it is an application for a development permit, the application is deemed complete for purposes of the chapter (§65943(a)). A resubmittal starts a new 30-day period (§65943(a), (b)).
What happens if a city misses the Permit Streamlining Act deadline to act on a project?
Government Code §65956(b) says: “In the event that a lead agency or a responsible agency fails to act to approve or to disapprove a development project within the time limits required by this article, the failure to act shall be deemed approval of the permit application for the development project.” The time limits for a lead agency are the seven periods in §65950(a), which run from 30 to 180 days depending on the environmental document and the type of project. Under the Housing Accountability Act, failing to comply with the time periods in §65950(a) is also one of the acts that count as disapproving a housing development project (§65589.5(h)(6)(B)). The applicant and the agency may agree in writing to extend a §65950 time limit (§65950(b)).
Statute text on this page: Government Code §§65589.5, 65589.5.1, 65589.5.2, 65941.1, 65905.5, 66300, 65943, 65950 and 65956, read November 12, 2026. These laws are amended most years; the dates show how current each quotation is.
Learn More
Sources: Government Code §§65589.5, 65589.5.1, 65589.5.2, 65941.1, 65905.5, 66300, 65943, 65950 and 65956, current text from the Legislature's bulk data (build of November 8, 2026); quotations verbatim and checked against that text when the site is built. Bills chaptered in 2026 from the same bulk data. The section links open the Legislature's site, which checks scripted visitors, so they are not machine-verified; verify before relying. General information about California law, not legal advice. No court decision, agency guidance or local ordinance is reported here.