CEQA Exemptions for Housing in California: the AB 130 Infill Exemption, Condition by Condition
The California Environmental Quality Act (CEQA) is a division of the Public Resources Code; its own text calls it this division
. It applies to discretionary projects proposed to be carried out or approved by public agencies
, and it names zoning ordinances, zoning variances, conditional use permits and tentative subdivision maps as examples (Pub. Resources Code §21080(a)). For a project that is not exempt, the lead agency adopts a negative declaration if it determines that the project would not have a significant effect on the environment (§21080(c)). If there is substantial evidence that the project may have a significant effect, an environmental impact report shall be prepared
(§21080(d)).
An exemption is a provision under which the Act does not apply to a project. There are two kinds. A statutory exemption is written in the Code itself: §21080(b) lists sixteen kinds of activity to which This division does not apply
, and separate sections add more, several of them for housing. A categorical exemption is one of the classes of projects listed in the state's CEQA Guidelines, which §21084(a) requires and §21080(b)(9) includes among the exempt activities.
This page sets out the housing exemptions in the statute as it read on November 12, 2026, starting with the infill housing exemption that AB 130 added in 2025.
Quick answer
A California housing project is exempt from CEQA when a statutory or categorical exemption covers it, and the lead agency makes that determination (Pub. Resources Code §21080.1(a)). The statutory exemption written for infill housing is §21080.66, added by AB 130 (Stats. 2025, Ch. 22) and amended by SB 158 (Stats. 2025, Ch. 650). It covers a housing development project that meets all eight conditions in subdivision (a): a site of not more than 20 acres, or four acres for a builder's remedy project or a project that applied under Gov. Code §65589.5(d)(5) as it read before January 1, 2025 ((a)(1)); a location in an incorporated municipality or a Census Bureau urban area ((a)(2)); one of four urban-use tests ((a)(3)); consistency with the general plan and zoning ((a)(4)); at least one-half of the applicable density in Gov. Code §65583.2(c)(3)(B) ((a)(5)); the requirements of Gov. Code §65913.4(a)(6) ((a)(6)); no demolition of a historic structure placed on a national, state or local historic register before the preliminary application was submitted ((a)(7)); and, for a project deemed complete on or after January 1, 2025, no portion designated for a hotel, motel, bed and breakfast inn or other transient lodging ((a)(8)). The section then sets tribal consultation ((b)), a phase I environmental assessment ((c)) and labor standards for some projects ((d)).
What the law does, and which sections hold it
There is no single housing exemption. The Public Resources Code holds several, each in its own section with its own conditions, and one section decides who applies them. This page covers nine sections:
| Pub. Resources Code | What it covers | Latest amendment, as the Legislature prints it |
|---|---|---|
| §21080 | Where the Act applies (discretionary projects) and the sixteen kinds of activity it does not apply to, in subdivision (b) | Amended by Stats. 2025, Ch. 106, Sec. 12. (AB 149) Effective September 17, 2025. |
| §21084 | The Guidelines' list of exempt classes of projects (categorical exemptions) and the limits on it | Amended by Stats. 2013, Ch. 76, Sec. 175. (AB 383) Effective January 1, 2014. |
| §21080.1 | The lead agency's determination; limited review for a housing development project that misses an exemption by a single condition, in subdivision (b) | Amended by Stats. 2025, Ch. 650, Sec. 7. (SB 158) Effective October 11, 2025. |
| §21080.66 | A housing development project that meets the eight conditions in subdivision (a): the AB 130 infill exemption | Amended by Stats. 2025, Ch. 650, Sec. 9. (SB 158) Effective October 11, 2025. |
| §21080.085 | A rezoning that implements the schedule of actions in an approved housing element | Added by Stats. 2025, Ch. 24, Sec. 6. (SB 131) Effective June 30, 2025. |
| §21080.45 | New agricultural employee housing with the funding or ownership the section lists; repair or maintenance of existing farmworker housing | Added by renumbering Section 21080.44 (as added by Stats. 2025, Ch. 24, Sec. 8) by Stats. 2025, Ch. 650, Sec. 8. (SB 158) Effective October 11, 2025. |
| §21080.40 | Five kinds of action for an affordable housing project as the section defines it | Amended by Stats. 2025, Ch. 503, Sec. 3. (AB 1021) Effective January 1, 2026. Repealed as of January 1, 2033, by its own provisions. |
| §21080.73 | Not an exemption: housing development projects meeting its listed criteria are not exempt | Added by Stats. 2025, Ch. 650, Sec. 10. (SB 158) Effective October 11, 2025. |
| §21080.77 | One named project in the City of San Diego | Added by Stats. 2026, Ch. 786, Sec. 1. (SB 344) Effective September 29, 2026. Conditionally operative on or after September 29, 2026, as prescribed by its own provisions. |
The infill housing exemption opens with the words that carry the exemption:
Without limiting any other statutory or categorical exemption, this division does not apply to any aspect of a housing development project, as defined in subdivision (b) of Section 65905.5 of the Government Code, including any permits, approvals, or public improvements required for the housing development project, as may be required by this division, if the housing development project meets all of the following conditions:— PRC §21080.66(a)
Three things follow from that sentence. The exemption reaches the project's permits, approvals and required public improvements. It is available only if the project meets all of the conditions in subdivision (a). And it leaves every other statutory or categorical exemption in place, so a project that does not fit §21080.66 may still fit another one. The section's own text does not use the word infill. AB 130 (Stats. 2025, Ch. 22) added the section, and SB 158 (Stats. 2025, Ch. 650) amended it with effect from October 11, 2025.
Categorical exemptions: what the statute says, and what is not on this page
The authority for categorical exemptions is one sentence of the Code:
The guidelines prepared and adopted pursuant to Section 21083 shall include a list of classes of projects that have been determined not to have a significant effect on the environment and that shall be exempt from this division. In adopting the guidelines, the Secretary of the Natural Resources Agency shall make a finding that the listed classes of projects referred to in this section do not have a significant effect on the environment.— PRC §21084(a)
§21080(b)(9) then exempts All classes of projects designated pursuant to Section 21084.
The rest of §21084 limits what a categorical exemption can cover:
- Greenhouse gases. A project's greenhouse gas emissions
shall not, in and of themselves, be deemed to cause an exemption adopted pursuant to subdivision (a) to be inapplicable
if the project complies with all applicable regulations or requirements adopted to implement statewide, regional, or local plans consistent with Section 15183.5 of Title 14 of the California Code of Regulations (§21084(b)). - Scenic highways. A project that may result in damage to scenic resources, including trees, historic buildings, rock outcroppings or similar resources, within a highway designated as an official state scenic highway is not exempted under §21084(a). This does not apply to improvements as mitigation for a project for which a negative declaration has been approved or an environmental impact report has been certified (§21084(c)).
- Listed sites.
A project located on a site that is included on any list compiled pursuant to Section 65962.5 of the Government Code shall not be exempted from this division pursuant to subdivision (a).
(§21084(d)) - Historical resources. A project that may cause a substantial adverse change in the significance of a historical resource, as specified in §21084.1, is not exempted under §21084(a) (§21084(e)).
The classes themselves are regulations, not statute. They are in the CEQA Guidelines in Title 14 of the California Code of Regulations, and that text is not held in this site's files, so this page does not describe any class, by number or by name. Read them at the source: the California Code of Regulations, Title 14, Division 6, Chapter 3 on the Office of Administrative Law's site, or the Natural Resources Agency's CEQA laws and regulations page. Neither link was opened when this page was written; they are the pointers recorded with the statute text.
What qualifies under §21080.66: the conditions, in the statute's order
Subdivision (a) lists the conditions. A project must meet every one of them. Each row gives the condition in plain words, the statute's own words, and where they are.
The project is a housing development project as Government Code §65905.5(b) defines it. That definition is in the Government Code, not in this section.
“a housing development project, as defined in subdivision (b) of Section 65905.5 of the Government Code”
Pub. Resources Code §21080.66(a)
Site size: the project site is not more than 20 acres, unless the next row applies.
“Except as provided in subparagraph (B), the project site is not more than 20 acres.”
Pub. Resources Code §21080.66(a)(1)(A)
Site size for a builder's remedy project, or a project that applied under Gov. Code §65589.5(d)(5) as it read before January 1, 2025: the project site or the parcel size is not more than four acres.
“The project site or the parcel size for a builder’s remedy project, as defined in paragraph (11) of subdivision (h) of Section 65589.5 of the Government Code, or the project site or the parcel size for a project that applied pursuant to paragraph (5) of subdivision (d) of Section 65589.5 of the Government Code as it read before January 1, 2025, is not more than four acres.”
Pub. Resources Code §21080.66(a)(1)(B)
Location: the site meets either of two criteria. It is inside an incorporated municipality, or it is inside an urban area as the United States Census Bureau defines it.
“(A) Is located within the boundaries of an incorporated municipality. (B) Is located within an urban area, as defined by the United States Census Bureau.”
Pub. Resources Code §21080.66(a)(2)(A), (B)
Prior use and surroundings: the site meets any one of four criteria.
“(A) Has been previously developed with an urban use. (B) At least 75 percent of the perimeter of the site adjoins parcels that are developed with urban uses. (C) At least 75 percent of the area within a one-quarter mile radius of the site is developed with urban uses. (D) For sites with four sides, at least three out of four sides are developed with urban uses and at least two-thirds of the perimeter of the site adjoins parcels that are developed with urban uses.”
Pub. Resources Code §21080.66(a)(3)(A) to (D)
Consistency: the project is consistent with the applicable general plan and zoning ordinance, and with any applicable local coastal program.
“The project is consistent with the applicable general plan and zoning ordinance, as well as any applicable local coastal program as defined in Section 30108.6.”
Pub. Resources Code §21080.66(a)(4)(A)
How consistency is judged: the project is deemed consistent if there is substantial evidence that would allow a reasonable person to conclude that it is.
“a housing development project shall be deemed consistent with the applicable general plan and zoning ordinance, and any applicable local coastal program, if there is substantial evidence that would allow a reasonable person to conclude that the housing development project is consistent”
Pub. Resources Code §21080.66(a)(4)(A)
Where the zoning and the general plan disagree with each other, consistency with one of them is consistency with both.
“If the zoning and general plan are not consistent with one another, a project shall be deemed consistent with both if the project is consistent with one.”
Pub. Resources Code §21080.66(a)(4)(B)
A density bonus, incentives or concessions, waivers or reductions of development standards, and reduced parking ratios approved under Gov. Code §65915 are not grounds for finding the project inconsistent.
“The approval of a density bonus, incentives or concessions, waivers or reductions of development standards, and reduced parking ratios pursuant to Section 65915 of the Government Code shall not be grounds for determining that the project is inconsistent with the applicable general plan, zoning ordinance, or local coastal program.”
Pub. Resources Code §21080.66(a)(4)(C)
Minimum density: the project will be at least one-half of the applicable density specified in Gov. Code §65583.2(c)(3)(B). The densities themselves are in that Government Code subparagraph, which this page does not reproduce.
“The project will be at least one-half of the applicable density specified in subparagraph (B) of paragraph (3) of subdivision (c) of Section 65583.2 of the Government Code.”
Pub. Resources Code §21080.66(a)(5)
The project satisfies the requirements of Gov. Code §65913.4(a)(6). The statute brings that paragraph in by reference and does not restate it; neither does this page.
“The project satisfies the requirements specified in paragraph (6) of subdivision (a) of Section 65913.4 of the Government Code.”
Pub. Resources Code §21080.66(a)(6)
No demolition of a historic structure that was placed on a national, state or local historic register before the date the project's preliminary application was submitted under Gov. Code §65941.1.
“The project does not require the demolition of a historic structure that was placed on a national, state, or local historic register before the date a preliminary application was submitted for the project pursuant to Section 65941.1 of the Government Code.”
Pub. Resources Code §21080.66(a)(7)
For a project deemed complete under Gov. Code §65589.5(h)(5) on or after January 1, 2025: no portion of the project is designated for use as a hotel, motel, bed and breakfast inn or other transient lodging.
“For a project that was deemed complete pursuant to paragraph (5) of subdivision (h) of Section 65589.5 of the Government Code on or after January 1, 2025, no portion of the project is designated for use as a hotel, motel, bed and breakfast inn, or other transient lodging.”
Pub. Resources Code §21080.66(a)(8)
Two things are not other transient lodging for that condition: a residential hotel, and a resident's use or marketing of a unit as short-term lodging after the certificate of occupancy is issued, in a manner consistent with local law.
“(A) A residential hotel, as defined in Section 50519 of the Health and Safety Code. (B) After the issuance of a certificate of occupancy, a resident’s use or marketing of a unit as short-term lodging, as defined in Section 17568.8 of the Business and Professions Code, in a manner consistent with local law.”
Pub. Resources Code §21080.66(a)(8)(A), (B)
Two terms in conditions (a)(3) are defined at the end of the section:
“Urban use” means any current or previous residential or commercial development, public institution, or public park that is surrounded by other urban uses, parking lot or structure, transit or transportation passenger facility, or retail use, or any combination of those uses.— PRC §21080.66(g)(3)
“Adjoins” includes parcels that are only separated by a street, pedestrian path, or bicycle path.— PRC §21080.66(g)(1)
Subdivision (e) adds that the section does not affect a project's eligibility for a density bonus, incentives or concessions, waivers or reductions of development standards, and reduced parking ratios under Gov. Code §65915 (§21080.66(e)).
Subdivisions (b), (c) and (d) come after the list of conditions. They are written as requirements: on the local government, on the development proponent, and on the project itself (its buildings and the pay of its construction workers). The text does not place them among the conditions in subdivision (a), and it does not say what happens to the exemption if one of them is not carried out. They are set out here in full because a project that uses the section takes them on.
Tribal notification and consultation: subdivision (b)
The local government sends a formal notification, by certified mail and email, to each California Native American tribe that is traditionally and culturally affiliated with the project site, as an invitation to consult.
“A local government shall provide formal notification via certified mail and email to each California Native American tribe that is traditionally and culturally affiliated with the project site as an invitation to consult on the proposed project, its location, and the project’s potential effects on tribal cultural resources”
Pub. Resources Code §21080.66(b)(1)(A)
Deadline for the notification: 14 days from the application being deemed complete under Gov. Code §65589.5(h)(5).
“Within 14 days of the application for the project being deemed complete pursuant to paragraph (5) of subdivision (h) of Section 65589.5 of the Government Code.”
Pub. Resources Code §21080.66(b)(1)(A)(i)
For an application deemed complete before July 1, 2026, the 14 days run from the local government being notified that the project is eligible to be exempt under this section. The clause does not name who gives that notice.
“For projects whose applications were deemed complete pursuant to paragraph (5) of subdivision (h) of Section 65589.5 of the Government Code before July 1, 2026, within 14 days of notifying the local government that the project is eligible to be exempt from this division pursuant to this section.”
Pub. Resources Code §21080.66(b)(1)(A)(ii)
The notification must include four things.
“(i) Detailed project information to help inform the consultation, including site maps, proposed project scope, and any known cultural resource studies. (ii) Contact information for the local government. (iii) Contact information for the project proponent. (iv) Notice that the California Native American tribe has 60 days to request consultation with the local government pursuant to this subdivision.”
Pub. Resources Code §21080.66(b)(1)(B)(i) to (iv)
Each tribe has 60 days to accept the invitation.
“Each California Native American tribe has 60 days to notify the local government that it accepts the invitation to consult.”
Pub. Resources Code §21080.66(b)(2)(A)
If a tribe declines, or does not notify the local government of its decision within 60 days, the consultation is treated as concluded.
“If a California Native American tribe chooses not to accept the invitation to consult, or does not notify the local government of its decision within 60 days, the consultation shall be considered to have concluded.”
Pub. Resources Code §21080.66(b)(2)(B)
When a tribe elects to consult, the local government initiates the consultation within 14 days of receiving that notification.
“Within 14 days of receiving the notification that the California Native American tribe has elected to consult, pursuant to subparagraph (A) of paragraph (2), the local government shall initiate the consultation.”
Pub. Resources Code §21080.66(b)(3)(A)
During the consultation the local government acts in good faith and gives deference to tribal information, knowledge and customs.
“During the consultation, the local government shall act in good faith to identify whether a tribal cultural resource could be affected by the proposed project and shall give deference to the tribal information, tribal knowledge and customs, and the significance of the resource to the California Native American tribe.”
Pub. Resources Code §21080.66(b)(3)(B)
The project proponent may take part with the tribe's approval, if the proponent agrees to engage in good faith and to comply with the confidentiality requirements the subparagraph lists.
“The project proponent may participate in the consultation with the approval of the California Native American tribe if the project proponent agrees to engage in good faith and comply with the confidentiality requirements of …”
Pub. Resources Code §21080.66(b)(3)(C)
The consultation looks for measures that would avoid significant impacts to a tribal cultural resource, and the local government documents its results.
“(D) The consultation shall seek to find measures that would avoid significant impacts to a tribal cultural resource. (E) The local government shall document the results of the consultation.”
Pub. Resources Code §21080.66(b)(3)(D), (E)
The consultation ends within 45 days of its start, with one 15-day extension if a participating tribe asks for it.
“The consultation shall conclude within 45 days of initiation, subject to a one-time 15-day extension upon request by a participating California Native American tribe.”
Pub. Resources Code §21080.66(b)(3)(F)
The local government makes any enforceable agreements reached in the consultation binding conditions of the project approval.
“The local government shall include, as binding conditions of the project approval, all of the following: (A) Any enforceable agreements reached during the project consultation.”
Pub. Resources Code §21080.66(b)(4)(A)
It also makes seven listed measures binding conditions, unless the tribe and the project proponent agree to leave a measure out.
“All of the following measures, unless there is mutual agreement between the California Native American tribe and the project proponent not to include the measure as a binding condition:”
Pub. Resources Code §21080.66(b)(4)(B)
The seven measures in (b)(4)(B) are:
- On request by a California Native American tribe, tribal monitoring during all ground-disturbing activities. The tribe designates the monitor, the monitor complies with the applicant's site access and workplace safety requirements, and the applicant compensates the monitor at a reasonable rate, determined in good faith, that aligns with customary compensation for cultural resource monitoring (§21080.66(b)(4)(B)(i)).
- Tribal cultural resources are avoided where feasible, in accordance with §21084.3(a). Where feasible, the applicant gives deference to tribal preferences regarding access to spiritual, ceremonial and burial sites, and incorporates tribal traditional knowledge in the protection and sustainable use of tribal cultural resources and landscapes (§21080.66(b)(4)(B)(ii)).
- All treatment and documentation of tribal cultural resources is conducted in a culturally appropriate manner, consistent with §21083.9 (§21080.66(b)(4)(B)(iii)).
- A California Historical Resources Information System archaeological records search and a tribal cultural records search are completed for the project site (§21080.66(b)(4)(B)(iv)).
- A Sacred Lands Inventory request is submitted to the Native American Heritage Commission (§21080.66(b)(4)(B)(v)).
- The project complies with Health and Safety Code §7050.5 and Pub. Resources Code §5097.98, including immediate work stoppage upon discovery of human remains or burial grounds, and treatment in accordance with applicable law and in consultation with the affected tribe (§21080.66(b)(4)(B)(vi)).
- Tribal ecological knowledge is applied in habitat restoration efforts undertaken by the project, as applicable to the specific environmental context and conditions of the project (§21080.66(b)(4)(B)(vii)).
Subdivision (b)(5) defines the terms: California Native American tribe has the meaning in §21073 (§21080.66(b)(5)(A)), and enforceable agreement and tribal cultural resource are defined in (b)(5)(B) and (b)(5)(C). An enforceable agreement's terms must be enforceable against the project proponent by the local government and the tribe (§21080.66(b)(5)(B)).
Environmental assessment and housing near a freeway: subdivision (c)
The local government requires a phase I environmental assessment as a condition of approval.
“The local government shall, as a condition of approval for the development, require the development proponent to complete a phase I environmental assessment, as defined in Section 78090 of the Health and Safety Code.”
Pub. Resources Code §21080.66(c)(1)(A)
If a recognized environmental condition is found, the development proponent completes a preliminary endangerment assessment.
“If a recognized environmental condition is found, the development proponent shall complete a preliminary endangerment assessment, as defined in Section 78095 of the Health and Safety Code, prepared by an environmental assessor to determine the existence of any release of a hazardous substance on the site and to determine the potential for exposure of future occupants to significant health hazards from any nearby property or activity.”
Pub. Resources Code §21080.66(c)(1)(B)
A release of a hazardous substance found on the site is removed, or its effects mitigated, before the certificate of occupancy.
“If a release of a hazardous substance is found to exist on the site, the release shall be removed or any effects of the release shall be mitigated to levels required by current federal and state statutory and regulatory standards before the local government issues a certificate of occupancy.”
Pub. Resources Code §21080.66(c)(1)(C)
A potential for exposure to significant hazards from surrounding properties or activities is mitigated before the certificate of occupancy.
“If a potential for exposure to significant hazards from surrounding properties or activities is found to exist, the effects of the potential exposure shall be mitigated to levels required by current federal and state statutory and regulatory standards before the local government issues a certificate of occupancy.”
Pub. Resources Code §21080.66(c)(1)(D)
Housing on the site within 500 feet of a freeway must meet five building requirements.
“For any housing on the site located within 500 feet of a freeway, all of the following shall apply: (A) The building shall have a centralized heating, ventilation, and air-conditioning system. (B) The outdoor air intakes for the heating, ventilation, and air-conditioning system shall face away from the freeway. (C) The building shall provide air filtration media for outside and return air that provides a minimum efficiency reporting value of 16. (D) The air filtration media shall be replaced at the manufacturer’s designated interval. (E) The building shall not have any balconies facing the freeway.”
Pub. Resources Code §21080.66(c)(2)(A) to (E)
Labor standards: subdivision (d)
Where 100 percent of the units are dedicated to lower income households: all construction workers are paid at least the general prevailing rate of per diem wages. Apprentices registered in approved programs may be paid at least the applicable apprentice prevailing rate. This applies whether or not the project is a public work.
“all construction workers employed in the execution of a housing development project exempt from this division pursuant to this section where 100 percent of the units within the development project are dedicated to lower income households, as defined by Section 50079.5 of the Health and Safety Code, shall be paid at least the general prevailing rate of per diem wages for the type of work and geographic area”
Pub. Resources Code §21080.66(d)(1)
Buildings over 85 feet in height above grade: the labor standards of Gov. Code §65913.4(a)(8) apply. Those standards are in the Government Code and are not restated in this section.
“Notwithstanding any other law, the labor standards of paragraph (8) of subdivision (a) of Section 65913.4 of the Government Code shall apply to buildings over 85 feet in height above grade in any housing development project exempt from this division pursuant to this section.”
Pub. Resources Code §21080.66(d)(2)
City and County of San Francisco, projects of 50 units or greater that the previous row does not cover: the labor standards of the Government Code article that begins at §65912.130 apply, craft by craft, on the test the subparagraph states.
“the labor standards of Article 4 (commencing with Section 65912.130) of Chapter 4.1 of Division 1 of Title 7 of the Government Code shall apply for projects of 50 units or greater in the City and County of San Francisco that are not covered by paragraph (2), for any construction craft where at least 50 percent of the units in market-rate multifamily housing projects that received their certificate of occupancy between 2022 and 2024, inclusive, were built by workers that were paid not less than the general prevailing rate of per diem wages.”
Pub. Resources Code §21080.66(d)(3)(A)
Which crafts meet that San Francisco test is determined by the Department of Industrial Relations and published on its website.
“The eligibility of this subparagraph, by classification, will be determined by the Department of Industrial Relations and published on its internet website by January 1, 2026.”
Pub. Resources Code §21080.66(d)(3)(C)(i)
Labor Code §218.8 extends to the development proponent, meaning the developer who submits the application for the exempt project.
“The provisions of Section 218.8 of the Labor Code shall extend to the development proponent in addition to the direct contractor or subcontractor.”
Pub. Resources Code §21080.66(d)(4)
A joint labor-management cooperation committee may take the three kinds of enforcement step the paragraph lists on an exempt project, for violations that occur on the construction site. The court awards a prevailing committee its reasonable attorney's fees and costs. An action must be filed within one year of the certificate of occupancy.
“An action brought pursuant to this paragraph shall be filed within one year of a local government issuing a certificate of occupancy for the housing development project or for the portion relating to the action.”
Pub. Resources Code §21080.66(d)(5)(A) to (D)
For subdivision (d)(3), a market-rate multifamily housing development project is a housing development project of greater than 10 units where less than 95 percent of the units are dedicated to lower income households (§21080.66(d)(3)(B)). Construction worker is defined in §21080.66(g)(2).
The other housing provisions in the Code
Rezoning that carries out a housing element: §21080.085
This division does not apply to a rezoning that implements the schedule of actions contained in an approved housing element pursuant to subdivision (c) of Section 65583 of the Government Code.— PRC §21080.085(a)
- The exemption does not apply to a rezoning that would allow for the construction of a distribution center or for oil and gas infrastructure (§21080.085(b)(1)(A)).
- It does not apply to a rezoning that would allow for construction to occur within the boundaries of any natural and protected lands as defined under §21067.5 (§21080.085(b)(1)(B)).
- A rezoning whose boundaries contain natural and protected lands is still exempt if those lands are excluded from the rezoning (§21080.085(b)(2)(A)(i)). For that rule, natural and protected lands does not include the lands described in §21067.5(p) (§21080.085(b)(2)(A)(ii)).
- The rezoning of a parcel, or portion of a parcel, excluded in that way is a separate project that is subject to the Act (§21080.085(b)(2)(B)).
The subject of this section is the rezoning. SB 131 (Stats. 2025, Ch. 24) added it, effective June 30, 2025. §21067.5, which defines natural and protected lands, is not among the sections read for this page.
Agricultural employee housing: §21080.45
This division does not apply to a new agricultural employee housing project that complies with Section 21159.22, meets the requirements of paragraphs (1) to (4), inclusive, of subdivision (i) of Section 17021.8 of the Health and Safety Code, and that is any of the following:— PRC §21080.45(a)
- Funded by the Joe Serna, Jr. Farmworker Housing Grant Program (§21080.45(a)(1)).
- Funded by the Office of Migrant Services within the Department of Housing and Community Development (§21080.45(a)(2)).
- Funded by a local government (§21080.45(a)(3)).
- Owned or operated and funded by a public or nonprofit entity, or receiving state, federal, or local public funding (§21080.45(a)(4)).
A second exemption in the same section covers a project consisting exclusively of the repair or maintenance of an existing farmworker housing project
(§21080.45(b)). The two requirements the section brings in by reference, §21159.22 and Health and Safety Code §17021.8(i)(1) to (4), are not among the sections read for this page. SB 131 added this section as §21080.44 and SB 158 renumbered it §21080.45, effective October 11, 2025.
Affordable housing projects and public agency actions: §21080.40
This section exempts five kinds of action for an affordable housing project, on the conditions in its subdivision (c). The version described here is the one in effect on November 12, 2026; a 2026 bill amends it from January 1, 2027 (see what changes next), and the section repeals itself on January 1, 2033.
What is exempt: five actions, subject to subdivision (c).
“(1) The issuance of an entitlement by a public agency for an affordable housing project. (2) An action to lease, convey, or encumber land owned by a public agency for an affordable housing project. (3) An action to facilitate the lease, conveyance, or encumbrance of land owned or to be purchased by a public agency for an affordable housing project. (4) Rezoning, specific plan amendments, or general plan amendments required specifically and exclusively to allow the construction of an affordable housing project. (5) An action to provide financial assistance in furtherance of implementing an affordable housing project.”
Pub. Resources Code §21080.40(b)(1) to (5)
The project is multifamily residential only, or mixed use with at least two-thirds of its square footage designated for residential use.
“a project consisting of multifamily residential uses only or a mix of multifamily residential and nonresidential uses, with at least two-thirds of the square footage of the project designated for residential use”
Pub. Resources Code §21080.40(a)(1)
Affordability: the project meets either of two tests.
“(i) All of the residential units within the project, excluding managers’ units, are dedicated to lower income households, as defined by Section 50079.5 of the Health and Safety Code. (ii) The project complies with all of the requirements of Section 65914.7 of the Government Code.”
Pub. Resources Code §21080.40(a)(1)(A)(i), (ii)
Labor standards: those in Gov. Code §65912.130, and for a project with 50 or more residential units also those in Gov. Code §65912.131.
“(i) The project meets the labor standards set forth in Section 65912.130 of the Government Code. (ii) In addition to clause (i), for a project with 50 or more residential units, the project meets the labor standards set forth in Section 65912.131 of the Government Code.”
Pub. Resources Code §21080.40(a)(1)(B)(i), (ii)
Location: the project is on a legal parcel or parcels in any of four locations.
“(i) In a city where the city boundaries include some portion of either an urbanized area or urban cluster, as designated by the United States Census Bureau, or in an unincorporated area, and the legal parcel or parcels are wholly within the boundaries of an urbanized area or urban cluster, as designated by the United States Census Bureau. (ii) Within one-half mile walking distance to either a high-quality transit corridor or a major transit stop. (iii) In a very low vehicle travel area. (iv) Proximal to six or more amenities pursuant to paragraph (3) as of the date of submission of the application for the project.”
Pub. Resources Code §21080.40(a)(1)(C)(i) to (iv)
Surroundings: urban uses adjoin at least 75 percent of the site's perimeter, or at least three sides of a four-sided site.
“Parcels that are developed with urban uses adjoin at least 75 percent of the perimeter of the project site or at least three sides of a four-sided project site. For purposes of this paragraph, parcels that are only separated by a street or highway shall be considered to be adjoined.”
Pub. Resources Code §21080.40(a)(1)(D)
The exemption applies if the action requires the project to meet all of the requirements in subdivision (c). The first is a recorded regulatory agreement, except for a project that complies with all of Gov. Code §65914.7.
“The affordable housing project will be subject to a recorded California Tax Credit Allocation Committee regulatory agreement. This requirement does not apply to affordable housing projects that comply with all of the requirements of Section 65914.7 of the Government Code.”
Pub. Resources Code §21080.40(c)(1)
The site can be served by utilities.
“The affordable housing project site can be adequately served by existing utilities or extensions.”
Pub. Resources Code §21080.40(c)(2)
A public agency confirms that the site satisfies subparagraphs (B) to (K) of Gov. Code §65913.4(a)(6). Those subparagraphs are in the Government Code and are not restated here.
“The project site satisfies the requirements specified in subparagraphs (B) to (K), inclusive, of paragraph (6) of subdivision (a) of Section 65913.4 of the Government Code.”
Pub. Resources Code §21080.40(c)(3)(A)
A public agency confirms, for a vacant site, that it does not contain tribal cultural resources of the kind the subparagraph describes.
“For a vacant site, the project site does not contain tribal cultural resources that could be affected by the development that were found pursuant to a consultation described in Section 21080.3.1 and the effects of which cannot be mitigated pursuant to the process described in Section 21080.3.2.”
Pub. Resources Code §21080.40(c)(3)(B)
A public agency confirms that the development proponent has completed a phase I environmental assessment. A release of a hazardous substance, or a potential for exposure to significant hazards, that is found must be removed or mitigated as clauses (ii) and (iii) state.
“The development proponent has completed a phase I environmental assessment, as defined in Section 25319.1 of the Health and Safety Code.”
Pub. Resources Code §21080.40(c)(3)(C)(i) to (iii)
A public agency confirms, for a project site where multifamily housing is not a permitted use, that three more conditions are met.
“(i) None of the housing is located within 500 feet of a freeway, as defined in Section 332 of the Vehicle Code. (ii) None of the housing is located within 3,200 feet of a facility that actively extracts or refines oil or natural gas. (iii) The project site is not within a very high fire hazard severity zone, as indicated on maps adopted by the Department of Forestry and Fire Protection pursuant to Section 4202 or as designated pursuant to subdivisions (a) and (b) of Section 51179 of the Government Code.”
Pub. Resources Code §21080.40(c)(3)(D)(i) to (iii)
The section defines its own terms: high-quality transit corridor in (a)(2), proximal to an amenity in (a)(3), vacant site in (a)(4) and very low vehicle travel area in (a)(5). If the lead agency determines that an activity is not subject to the Act under this section and determines to approve or carry it out, it files a notice of exemption with the Office of Planning and Research and the county clerk (§21080.40(d)). State fire hazard maps are covered on this site's fire hazard severity zones page.
A section that removes exemptions: §21080.73
§21080.73 works the other way. Notwithstanding any other law
, a housing development project as defined in Gov. Code §65589.5(h)(2) that meets the following criteria shall be considered a discretionary project
and shall not be exempt from this division
. It lists five criteria:
- The project is in a city with a population of more than 85,000 but less than 95,000, as determined by the 2020 Census (§21080.73(a)).
- The project is in a county with a population of more than 440,000 but less than 455,000, as determined by the 2020 Census (§21080.73(b)).
- A portion of the parcel where the project is located is identified on a United States Fish and Wildlife Service map as freshwater forested or shrub wetland (§21080.73(c)).
- A portion of that parcel is within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps it publishes (§21080.73(d)).
- The project is on a parcel adjacent to a California historical landmark on the California Register of Historic Places (§21080.73(e)).
The section names no city or county. Its opening sentence says the following criteria
, without the word all or any. SB 158 (Stats. 2025, Ch. 650) added it, effective October 11, 2025.
One named project in San Diego: §21080.77
§21080.77 concerns a single project, the Midway Rising project in the City of San Diego (§21080.77(a)(1)). It does not use the word exempt. It deems the city's Midway Rising Specific Plan Subsequent Final Environmental Impact Report sufficient, adequate, and complete for full compliance with this division
(§21080.77(b)) and makes the mitigation measures in that report conditions of approval of the project (§21080.77(c)). It applies to no other project. SB 344 (Stats. 2026, Ch. 786) added it as an urgency statute, effective September 29, 2026; its operative date is quoted under what changes next.
What takes a project out of §21080.66
§21080.66 has no separate list of excluded sites. A project is outside the exemption when it fails any one of the conditions in subdivision (a), because the exemption applies only if the housing development project meets all of the following conditions
. Read as exclusions, the conditions are:
- Not a housing development project as Gov. Code §65905.5(b) defines it (§21080.66(a)).
- A site of more than 20 acres (§21080.66(a)(1)(A)).
- A project site or parcel size of more than four acres, for a builder's remedy project as defined in Gov. Code §65589.5(h)(11) or a project that applied under Gov. Code §65589.5(d)(5) as it read before January 1, 2025 (§21080.66(a)(1)(B)).
- A site outside both the boundaries of an incorporated municipality and an urban area as defined by the United States Census Bureau (§21080.66(a)(2)).
- A site that meets none of the four urban-use criteria: previously developed with an urban use; at least 75 percent of the perimeter adjoining parcels developed with urban uses; at least 75 percent of the area within a one-quarter mile radius developed with urban uses; or, for a four-sided site, at least three sides developed with urban uses and at least two-thirds of the perimeter adjoining parcels developed with urban uses (§21080.66(a)(3)(A) to (D)).
- A project that is not consistent with the applicable general plan and zoning ordinance, and any applicable local coastal program, after applying the rules in (a)(4)(A) to (C) on how consistency is judged (§21080.66(a)(4)).
- A project below one-half of the applicable density specified in Gov. Code §65583.2(c)(3)(B) (§21080.66(a)(5)).
- A project that does not satisfy Gov. Code §65913.4(a)(6) (§21080.66(a)(6)). This condition brings in requirements written in another statute. This page does not list them, because that paragraph is not in the text read for this page; see the page on Gov. Code §65913.4.
- A project that requires demolishing a historic structure that was placed on a national, state, or local historic register before the date the preliminary application was submitted under Gov. Code §65941.1 (§21080.66(a)(7)).
- A project with any portion designated for a hotel, motel, bed and breakfast inn or other transient lodging, where the project was deemed complete under Gov. Code §65589.5(h)(5) on or after January 1, 2025. A residential hotel as defined in Health and Safety Code §50519, and a resident's use or marketing of a unit as short-term lodging after the certificate of occupancy in a manner consistent with local law, are not other transient lodging (§21080.66(a)(8)(A), (B)).
One circumstance outside the section also removes it. A housing development project that meets the criteria of §21080.73 is not exempt from the Act, and that section applies Notwithstanding any other law
.
The limits in §21084(c), (d) and (e) (scenic highways, listed sites, historical resources) are written for exemptions under §21084(a), that is, the Guidelines' classes. §21080.66 does not repeat them; its own conditions are the ones listed above.
If a housing project misses an exemption by a single condition: §21080.1(b)
A housing development project that fails one condition is not exempt, but under §21080.1 as amended by SB 158 (Stats. 2025, Ch. 650) the review it then needs is narrower:
If a proposed housing development project would otherwise be exempt from this division pursuant to a statutory exemption, or categorical exemption pursuant to Class 1 to 5, inclusive, 12, 15, 20, 27, 30, or 32 that is adopted before January 1, 2026, but for a single condition detailed in the statutory exemption or in Section 15300.2, 15301, 15302, 15303, 15304, 15305, 15312, 15315, 15320, 15322, 15327, 15330, or 15332 of Title 14 of the California Code of Regulations, as applicable, the application of this division to the approval of the proposed housing development project shall be limited to effects upon the environment that are caused solely by that single condition.— PRC §21080.1(b)(1)
- An initial study or environmental impact report for such a project is only required to examine the effects that the lead agency determines, based upon substantial evidence in the record, are caused solely by the single condition (§21080.1(b)(2)).
- An environmental impact report for such a project is not required to include any discussion of alternatives to the project or of its growth-inducing impacts (§21080.1(b)(3)).
- A condition, for this rule, is
a physical or regulatory feature of the project or its setting or an effect upon the environment caused by the project
(§21080.1(b)(5)(A)). Housing development project has the meaning in Gov. Code §65589.5 (§21080.1(b)(5)(B)), which is a different cross-reference from the one in §21080.66(a).
The rule does not apply to five kinds of project (§21080.1(b)(4)):
- One that is not similar in kind to the projects listed in the statutory or categorical exemption (§21080.1(b)(4)(A)).
- One that is ineligible for the exemption due to two or more conditions (§21080.1(b)(4)(B)).
- One that includes a distribution center or oil and gas infrastructure (§21080.1(b)(4)(C)).
- One located on natural and protected lands as defined under §21067.5; for this rule that definition does not include the lands described in §21067.5(o) (§21080.1(b)(4)(D)(i), (ii)).
- One whose project site or parcel size exceeds four acres, where the project is a builder's remedy project as defined in Gov. Code §65589.5(h)(11) or the applicant applied under Gov. Code §65589.5(d)(5) as it read before January 1, 2025 (§21080.1(b)(4)(E)(i), (ii)).
The class numbers and regulation sections in that quotation refer to the CEQA Guidelines, which are not in this site's files; this page does not describe what any of them covers.
What the city or county must do, and what the text leaves with it
The statute uses two names: the lead agency in §21080.1 and §21080.66(f), and the local government in §21080.66(b) and (c).
What it must do
- Decide whether the project is exempt.
The lead agency shall be responsible for determining whether the project is exempt from this division
(§21080.1(a)). - Apply the consistency test as written. The project is deemed consistent with the general plan, zoning ordinance and any applicable local coastal program
if there is substantial evidence that would allow a reasonable person to conclude that the housing development project is consistent
(§21080.66(a)(4)(A)). Where the zoning and the general plan are not consistent with one another, consistency with one is enough (§21080.66(a)(4)(B)). - Notify and consult tribes on the statute's clock: send the formal notification within 14 days of the application being deemed complete, initiate a consultation within 14 days of a tribe electing to consult, act in good faith and give deference to tribal information, and document the results (§21080.66(b)(1)(A), (b)(3)(A), (B), (E)).
- Attach the binding conditions: any enforceable agreements reached in the consultation, and the measures in (b)(4)(B) unless the tribe and the project proponent agree to leave one out (§21080.66(b)(4)).
- Require a phase I environmental assessment as a condition of approval (§21080.66(c)(1)(A)).
- File a notice of exemption with the Governor's Office of Land Use and Climate Innovation and the county clerk once it determines the Act does not apply under this section and determines to approve or carry out the activity (§21080.66(f)).
- Consult before the application, on request, in the case of a project described in §21065(c): the lead agency provides for consultation regarding the range of actions, potential alternatives, mitigation measures, and any potential and significant effects on the environment of the project (§21080.1(c)).
Limits on what it may do
- Treat a density bonus as an inconsistency. The approval of a density bonus, incentives or concessions, waivers or reductions of development standards, and reduced parking ratios under Gov. Code §65915
shall not be grounds for determining that the project is inconsistent with the applicable general plan, zoning ordinance, or local coastal program
(§21080.66(a)(4)(C)). - The certificate of occupancy comes after cleanup. Where the assessments find a release of a hazardous substance on the site, or a potential for exposure to significant hazards from surrounding properties or activities, the removal or mitigation is to be done
before the local government issues a certificate of occupancy
(§21080.66(c)(1)(C), (D)). - Review after a single missed condition is confined to that condition. For a housing development project that would be exempt, under a statutory exemption or one of the categorical exemption classes the subdivision lists, but for a single condition, the application of the Act
shall be limited to effects upon the environment that are caused solely by that single condition
(§21080.1(b)(1)), subject to the five cases in §21080.1(b)(4) where that rule does not apply.
What the text leaves with it
- Its own plans. The general plan, the zoning ordinance and any applicable local coastal program remain the measure: consistency with them is a condition of the exemption (§21080.66(a)(4)(A)).
- The approval itself. The section speaks of conditions of approval and of the project approval (§21080.66(b)(4), (c)(1)(A)). It removes the application of the Act; it does not say whether or when the local agency must approve the project. Those rules are in other statutes.
- Other exemptions. The section applies
Without limiting any other statutory or categorical exemption
(§21080.66(a)), so the lead agency can find a project exempt on another ground. - Local law on short-term lodging. A resident's use or marketing of a unit as short-term lodging, after the certificate of occupancy is issued, is not other transient lodging when it is
in a manner consistent with local law
(§21080.66(a)(8)(B)).
Process and deadlines the statute sets
The determination comes first, and it belongs to the lead agency:
The lead agency shall be responsible for determining whether the project is exempt from this division and whether an environmental impact report, a negative declaration, or a mitigated negative declaration shall be required for any project that is subject to this division. That determination shall be final and conclusive on all persons, including responsible agencies, unless challenged as provided in Section 21167.— PRC §21080.1(a)
§21167, which governs a challenge, is not among the sections read for this page, so the time limits for a challenge are not stated here. For a project using §21080.66, the section itself sets these steps:
| Step | When | Pub. Resources Code |
|---|---|---|
| Lead agency determines whether the project is exempt | No number of days is set in §21080.1 or §21080.66 | §21080.1(a) |
| Local government sends the formal notification to each affiliated tribe, by certified mail and email | Within 14 days of the application being deemed complete under Gov. Code §65589.5(h)(5) | §21080.66(b)(1)(A)(i) |
| The same notification, where the application was deemed complete before July 1, 2026 | Within 14 days of the local government being notified that the project is eligible to be exempt under §21080.66 | §21080.66(b)(1)(A)(ii) |
| Tribe notifies the local government that it accepts the invitation to consult | 60 days. If the tribe declines or does not notify its decision within 60 days, the consultation is considered concluded | §21080.66(b)(2)(A), (B) |
| Local government initiates the consultation | Within 14 days of receiving the tribe's notification that it has elected to consult | §21080.66(b)(3)(A) |
| Consultation concludes | Within 45 days of initiation, subject to a one-time 15-day extension on request by a participating tribe | §21080.66(b)(3)(F) |
| Local government documents the results and includes the agreements and measures as binding conditions | In the project approval | §21080.66(b)(3)(E), (b)(4) |
| Development proponent completes a phase I environmental assessment | Required by the local government as a condition of approval | §21080.66(c)(1)(A) |
| Any hazardous substance release found is removed or mitigated; any potential exposure found is mitigated | Before the local government issues a certificate of occupancy | §21080.66(c)(1)(C), (D) |
| Lead agency files a notice of exemption with the Governor's Office of Land Use and Climate Innovation and the county clerk | When it determines the Act does not apply under §21080.66 and determines to approve or carry out the activity; no number of days is set in the subdivision | §21080.66(f) |
| Any action by a joint labor-management cooperation committee under (d)(5) | Filed within one year of the local government issuing a certificate of occupancy for the project or for the portion relating to the action | §21080.66(d)(5)(C) |
The notice of exemption is the last step on the agency's side:
If a lead agency determines that this division does not apply to an activity pursuant to this section and determines to approve or carry out the activity, the lead agency shall file a notice of exemption with the Governor’s Office of Land Use and Climate Innovation and the county clerk of the county in which the activity will occur in the manner specified in subdivisions (b) and (c) of Section 21108 or subdivisions (b) and (c) of Section 21152, as applicable.— PRC §21080.66(f)
§21080.66 sets no period for the exemption determination itself, no deemed-approved rule and no expiry for the exemption. The dates on which an application is deemed complete come from Gov. Code §65589.5(h)(5), which the section refers to; see the Housing Accountability Act page.
What changed, and what changes next
Most of the sections on this page were added or amended in 2025. The record below is from the Legislature's history lines (in the table under which sections hold it) and the notes kept with the statute text:
- AB 130 (Stats. 2025, Ch. 22) added §21080.66. It also added §21080.43 (legislative findings on mitigation measures) and §21080.44 (a Transit-Oriented Development Implementation Fund for vehicle miles traveled mitigation); neither of those is an exemption, and neither is quoted on this page.
- SB 131 (Stats. 2025, Ch. 24) added §21080.085 and the agricultural employee housing exemption, which it numbered §21080.44, and amended §21080.1; the single-condition rule in §21080.1(b) was in that bill before SB 158 amended the section again.
- SB 158 (Stats. 2025, Ch. 650), effective October 11, 2025, amended §21080.66 and §21080.1, renumbered the agricultural employee housing section §21080.45, and added §21080.73.
- AB 1021 (Stats. 2025, Ch. 503) amended §21080.40, effective January 1, 2026.
- SB 344 (Stats. 2026, Ch. 786), an urgency statute effective September 29, 2026, added §21080.77.
Bills chaptered in 2026 that touch these sections, or add a section beside them:
SB 344 (Stats. 2026, Ch. 786): PRC §21080.77 added
In effect since September 29, 2026; its changes are in the text quoted on this page.
Bill title as printed: “California Environmental Quality Act: City of San Diego: mixed-use development project.” What SB 344 changes, in the Legislative Counsel's words
AB 1732 (Stats. 2026, Ch. 792): PRC §21080.40 amended
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “California Environmental Quality Act: exemption: affordable housing projects: public university or public college housing projects.” What AB 1732 changes, in the Legislative Counsel's words
SB 887 (Stats. 2026, Ch. 439): PRC §21084 amended
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “California Environmental Quality Act: environmental leadership development projects: data centers: geothermal powerplant projects.” What SB 887 changes, in the Legislative Counsel's words
SB 958 (Stats. 2026, Ch. 788): PRC §21080.82 added
Takes effect January 1, 2027. Its changes are not yet in the text quoted on this page.
Bill title as printed: “California Environmental Quality Act: environmental impacts: building height.” What SB 958 changes, in the Legislative Counsel's words
The text quoted on this page is the law as it stood on November 12, 2026. The bills above that take effect on January 1, 2027 are not in it, and this page does not describe what they change beyond the section each one touches. The notes kept with the statute text describe the new §21080.82 only by its subject: building-height impacts on infill sites. All the 2026 bills in this area are on the page for California housing laws taking effect in 2027.
Two sections carry their own dates. §21080.40 repeals itself:
This section shall remain in effect only until January 1, 2033, and as of that date is repealed.— PRC §21080.40(e)
And §21080.77 sets its own operative date:
This section shall become operative upon the effective date of this section or on the date the City Council of the City of San Diego certifies the Midway Rising Specific Plan Subsequent Final Environmental Impact Report (SCH No. 2023120451), whichever occurs later.— PRC §21080.77(d)
Other dates are written into the conditions themselves and are quoted where they apply: January 1, 2025 in §21080.66(a)(1)(B) and (a)(8); July 1, 2026 in §21080.66(b)(1)(A)(ii); January 1, 2026 in §21080.66(d)(3)(C)(i) and §21080.1(b)(1); January 1, 2025 again in §21080.1(b)(4)(E)(ii).
What this page does not cover
- The categorical exemption classes. They are in the CEQA Guidelines (Title 14 of the California Code of Regulations), which are not in this site's files. The links under categorical exemptions point to the official text.
- Local plans and standards. Whether a project is consistent with a city or county's general plan, zoning ordinance or local coastal program depends on those documents, which this page does not hold.
- The facts of a project or site. Acreage, surrounding uses, historic register status, distance to a freeway and the date an application was deemed complete are facts to establish with the local agency.
- Sections the statute refers to but this page did not read. In the Government Code: §65905.5(b) and §65589.5 (definitions of housing development project, builder's remedy project, deemed complete), §65583.2(c)(3)(B) (the densities), §65913.4(a)(6) and (a)(8), §65914.7, and §65912.130 and §65912.131. In the Public Resources Code: §21067.5 (natural and protected lands), §21159.22, §21167 (challenges), §21108 and §21152 (how a notice of exemption is filed). Also the Health and Safety Code and Labor Code sections cited in §21080.66(c) and (d).
- Older and narrower exemptions. The Code holds other housing exemptions that were not read for this page, for example §21080.27, §21080.50 and §§21159.21 to 21159.24.
- Court decisions and agency guidance on any of these sections.
Several of the Government Code sections named above have their own pages, built the same way: streamlined ministerial approval (Gov. Code §65913.4), the Housing Accountability Act (Gov. Code §65589.5), the builder's remedy, the Density Bonus Law (Gov. Code §65915) and AB 2011 (Gov. Code §65912.100 and following, including the labor standards in §65912.130). The housing and land use law hub lists them all.
Frequently Asked Questions
What is CEQA?
CEQA is the California Environmental Quality Act, a division of the Public Resources Code. Under Public Resources Code §21080(a) it applies to “discretionary projects proposed to be carried out or approved by public agencies”, including zoning ordinances, zoning variances, conditional use permits and tentative subdivision maps, “unless the project is exempt from this division”. If the lead agency determines that a project that is not exempt would not have a significant effect on the environment, it adopts a negative declaration (§21080(c)). If there is substantial evidence that the project may have a significant effect, an environmental impact report is prepared (§21080(d)).
What is the difference between a statutory exemption and a categorical exemption under CEQA?
A statutory exemption is written in the Public Resources Code itself. §21080(b) lists sixteen kinds of activity the Act does not apply to, and separate sections add more, such as §21080.66 for housing. A categorical exemption is a class of projects listed in the state's CEQA Guidelines: §21084(a) says the Guidelines “shall include a list of classes of projects that have been determined not to have a significant effect on the environment and that shall be exempt from this division”, and §21080(b)(9) exempts those classes. §21084(c), (d) and (e) bar a categorical exemption for a project that may result in damage to scenic resources within a highway designated as an official state scenic highway, a project located on a site included on a list compiled under Government Code §65962.5, and a project that may cause a substantial adverse change in the significance of a historical resource. The classes themselves are regulations (Cal. Code Regs., tit. 14) and are not reproduced on this page.
What is the AB 130 CEQA exemption for infill housing?
It is Public Resources Code §21080.66, added by AB 130 (Stats. 2025, Ch. 22) and amended by SB 158 (Stats. 2025, Ch. 650). Under subdivision (a), “this division does not apply to any aspect of a housing development project” that meets all eight conditions in (a)(1) to (a)(8): a site of not more than 20 acres; a location in an incorporated municipality or a Census Bureau urban area; one of four urban-use tests; consistency with the general plan and zoning; at least one-half of the applicable density in Government Code §65583.2(c)(3)(B); the requirements of Government Code §65913.4(a)(6); no demolition of a historic structure placed on a national, state or local historic register before the preliminary application was submitted; and, for a project deemed complete on or after January 1, 2025, no portion designated for a hotel, motel, bed and breakfast inn or other transient lodging. Subdivisions (b), (c) and (d) add tribal consultation, a phase I environmental assessment and labor standards for some projects.
How large can the site be under Public Resources Code §21080.66, and can a builder's remedy project use it?
The general limit is in (a)(1)(A): “the project site is not more than 20 acres”. Under (a)(1)(B) a smaller limit applies to a builder's remedy project as defined in Government Code §65589.5(h)(11), and to a project that applied under Government Code §65589.5(d)(5) as it read before January 1, 2025: the project site or the parcel size “is not more than four acres”. So a builder's remedy project is not excluded by name, but it must meet the four-acre limit and every other condition in subdivision (a).
Does a project that uses the §21080.66 exemption have to pay prevailing wages?
Subdivision (d) sets a prevailing wage rule for one kind of project and brings in labor standards from the Government Code for two others. Where 100 percent of the units are dedicated to lower income households, all construction workers “shall be paid at least the general prevailing rate of per diem wages for the type of work and geographic area” (§21080.66(d)(1)). The labor standards of Government Code §65913.4(a)(8) apply “to buildings over 85 feet in height above grade” (§21080.66(d)(2)). A separate rule in (d)(3) covers projects of 50 units or greater in the City and County of San Francisco, craft by craft. For every exempt project, (d)(4) extends Labor Code §218.8 to the development proponent and (d)(5) lets a joint labor-management cooperation committee take the enforcement steps it lists.
Is tribal consultation required for the AB 130 infill exemption?
Yes, the local government must invite it. Under §21080.66(b)(1)(A) the local government sends a formal notification by certified mail and email to each California Native American tribe traditionally and culturally affiliated with the project site, “Within 14 days of the application for the project being deemed complete” under Government Code §65589.5(h)(5); for an application deemed complete before July 1, 2026, the 14 days run from the local government being notified that the project is eligible for the exemption (§21080.66(b)(1)(A)(ii)). The tribe “has 60 days to notify the local government that it accepts the invitation to consult” (§21080.66(b)(2)(A)). If it accepts, the local government starts the consultation within 14 days (§21080.66(b)(3)(A)), and “The consultation shall conclude within 45 days of initiation, subject to a one-time 15-day extension upon request by a participating California Native American tribe.” (§21080.66(b)(3)(F)). Enforceable agreements reached in the consultation, and the measures in (b)(4)(B) unless the tribe and the project proponent agree to leave one out, become binding conditions of the project approval (§21080.66(b)(4)).
What happens if a housing project misses a CEQA exemption by one condition?
Public Resources Code §21080.1(b), in the text as amended by SB 158 (Stats. 2025, Ch. 650), narrows the review. If a housing development project would be exempt under a statutory exemption, or under one of the categorical exemption classes the subdivision lists, “but for a single condition”, then the application of the Act “shall be limited to effects upon the environment that are caused solely by that single condition” (§21080.1(b)(1)). An environmental impact report for such a project need not discuss alternatives or growth-inducing impacts (§21080.1(b)(3)). The rule does not apply to a project that misses by two or more conditions, and §21080.1(b)(4) lists four other cases where it does not apply.
Learn More
Statute text on this page: Public Resources Code §§21080, 21080.1, 21080.40, 21080.45, 21080.66, 21080.73, 21080.77, 21080.085 and 21084, read November 12, 2026. These laws are amended most years; the dates show how current each quotation is.
Sources: Public Resources Code §§21080, 21084, 21080.1, 21080.66, 21080.085, 21080.45, 21080.73, 21080.40 and 21080.77 (current text from the Legislature's bulk data, build of November 8, 2026; quotations verbatim and checked against that text when the site is built). Which bill added or amended each section is from the Legislature's history lines and the notes kept with the statute text. Bills chaptered in 2026 are from the same bulk data. The CEQA Guidelines (Cal. Code Regs., tit. 14) were not read. The section links open the Legislature's site, which checks scripted visitors, so they are not machine-verified; verify before relying. General information about California law, not legal advice.
Last reviewed: November 2026.